heavy-weighted hammer的用法和样例:
例句
- Under the impact of a large hammer, a high signal noise ratio of the force and velocity can be acquired in the high-strain dynamic testing.
高应变动力试桩法采用数吨重锤锤击,同时实测了桩顶的力信号和速度信号,具有很高的信噪比。 - Free falling heavy rammer was used in former piling constructions, but the piling depth and pile pipe diameter were comparatively small.
在以往的施工中采用重锤下落打桩,打桩的深度和桩管的直径都比较小。