您要查找的是不是:
- Subsidiary company get preferential treatment when it come to subcontract work. 分公司承接转包(二包)工作时会得到优惠待遇。
- The project will subcontract work with Shaanxi Forestry Department (SFD), Shaanxi Environmental Protection Bureau (SEPB) and Shaanxi Tourism Bureau to develop an eco-tourism guideline. 该项目将和陕西林业局、陕西环境保护局和陕西旅游局签订分包合同,制定生态旅游方针。
- Time for Completion The Completion Date of the Subcontract Works shall be Oct. 23rd, 1997. 转包合同完成的日期为1997年10月23日
- The advance payments made to the subcontractors prior to the completion of the subcontract works. 在分包工程的工作量完成之前预付给分包单位的款项。
- Drawings"means the Contractor's Design Intent of the Subcontract Works as listed in the Appendix, and any Variation to the Contractor's Design Intent. 图纸"指列在附录中的总包商的设计意图,以及对总包商设计意图的任何变更。
- The Subcontractor shall give notices, make applications, and pay fees, impost and other charges in respect of the Subcontract Works promptly, properly and diligently. 分包商应就分包工程及时,适当和勤勉地给予所有通知,提出申请,并支付规费,税款和其它收费。
- Subcontract Price"means the agreed amount stated in the Agreement for the design, execution and completion of the Subcontract Works and the remedying of any defects. 分包合同总价"指就分包工程设计,实施和竣工,及维修其所有缺陷,而在合同协议中所述的约定金额。
- "Drawings" means the Contractor's Design Intent of the Subcontract Works as listed in the Appendix, and any Variation to the Contractor's Design Intent. "图纸"指列在附录中的总包商的设计意图,以及对总包商设计意图的任何变更。
- Outsourcing :refers to subcontracting work to an outside company that specializes in that particular type of work. (外包:把工作承包给一个专门从事这种特定种类工作的外部公司。)
- Your work falls short of my expectations. 你的工作未达到我的期望。
- I think the work can be completed ahead of time. 我认为这项工作能提前完成。
- Routine office work is my bread and butter. 日常的办公室工作是我的谋生之道。
- To send the materials provided to a subcontractor for subcontracting work (assembly or further processing) via an SD delivery. 通过SD交运为分包作业(装配或深加工)向供应商提供材料.
- The contractor has accepted a tender by the subcontractor for the execution and completion of such works (hereinafter called "subcontract works") and the remedying of the any defects therein. 承包人已接受转包人承担这项工程,完成以下工程(以下简称"转包工程")的施工、竣工的投保以及修补其任何缺陷。
- We will put the electrical work out to subcontract. 我们将把电气工作转包出去。
- He gets a work that gives scope for his abilities. 他得到了一份有机会发挥他才能的工作。
- I was inspired to work harder than ever before. 我受激励比以往任何时候都更加努力地工作。
- It took a long while to do the work. 做这个工作花了许多时间。
- As a work of art it is very poor. 作为艺术品这是十分拙劣的。
- He did the work so badly that I had to do it all over again myself. 他干的太差劲了,我只好亲自重做。