More points invested into the Chrono powers increases the size of the rift, the amount of time the effect lasts, and the protocol's cool-down timer. 更多的点数投资在时空能力上将会增加裂缝的大小,持续的时间,以及协议冷却的时间。
The results of the studies show that the size, length, and scope of tunnel lining crack can be identify by infrared thermography images. 经实地检测高雄市西子湾隧道和高雄县大关山隧道,发现隧道衬砌之孔洞与裂缝部位,其红外线热影像温度差异变化大于没有孔洞裂缝之衬砌。