您要查找的是不是:
- diversion tunnel outlet slope 导流洞出口边坡
- COMPREHENSIVE TREATMENT OF THE SIDE SLOPE OF NO.2 DIVERSION TUNNEL OUTLET IN ZIPINGPU HYDRO PROJECT 紫坪铺工程%232导流洞出口边坡综合治理
- Analysis on Deformation and Failure Characteristics of the Side Slope of No.2 Diversion Tunnel Outlet in Zipingpu Hydro Project 紫坪铺工程%232导流洞出口边坡变形破坏特征分析
- Excavation Construction of Diversion Tunnel Outlet Locking and Negative-geological Section 导流洞出口锁口和出口段不良地质洞段开挖施工
- Shape, size, site, color, and inlet and outlet slope of page nexto page. 页连接符号的形状、大小、位置、颜色、进出箭头。
- The Construction of Cable Anchorages for High Side Slope at the Outlet of No. 1 Diversion Tunnel in Zipingpu 紫坪铺1%23导流洞出口高边坡锚索施工
- This method has been used in the stability analysis of the entrance and outlet slope of Qingjiang Geheyan Hydropower Station and achieved good results. 该方法在清江隔河岩水电站进出口边坡稳定性分析中获得了较好的结果。
- The results of example analysis of diversion tunnel of Taipingyi Hydropower station show that LERR is rational. 分析结果表明,该指标具有一定的科学合理性。
- The tunnel broke the record of the world's longest water diversion tunnel held by Japan's Seikan (Aomori-Hakodate) tunnel, which is 53.86 km long. 这条隧洞打破了此前由日本青函隧洞所保持的世界最长输水隧洞的纪录。日本青函隧洞全长53.;86公里。
- When advancing from No. 1 diversion tunnel location (DK 141+430), in July 2002, rail transport proposal was used, with LW backhoe loader and 12t battery car and 14m3 muck shifter. 2002年2月施工至DK145+930后换装采用有轨运输,多功能开挖台架,人工手持风钻钻眼,LW-150挖掘装载机装碴,12t电瓶车牵引14m3梭式矿车出碴。
- The total tunnel length of the longest hydraulic tunnel in Taiwan, the New Wuchieh Diversion Tunnel and Lishi Creek Diversion Project of Taiwan Power Company, is about 16.5 km. 新武界隧道及栗栖溪引水工程之隧道???16.;5km;?建完成後??樘?匙铋L之水利隧道。
- A new form of energy dissipater named suspended grid plunge pool is posed through the hydraulic model experiment of diversion tunnel in Jilintai first-or. 悬栅消力池是在新疆喀什河吉林台一级水电站引水隧洞水力学模型试验中提出的一种新型消能工型式。
- In this layout, the diversion tunnel adopts the two-machine, the two-tunnel and underground power house, and the tailrace tunnel adopts the two-machine and one-tunnel. 尾水洞为两机一洞布置,两个进水口布置在二期厂房与白山水库泄洪洞冲坑之间的左崖山体处;
- Finally, the mechanical parameters of the rock mass and the initial stress of filed the rock around the faultage F3 in diversion tunnel No. 2 were analyzed. 最后,利用上述方法反演得到了(上标%23)2导流隧洞F3断层附近岩层的岩体力学参数和初始地应力场。
- There are many main buildings in the plant such as concrete-faced rockfill darn, the second darn with clay core, spillway, diversion tunnel, surge tank, ground workshop and switch mom etc. 电站的主要建筑物有砼面板堆石坝、粘土心墙二坝、溢洪道、引水隧洞、调压井、地面厂房和开关站等。
- The tunnel diversion for once damming dam is adopted in the construction of Songjianghe river cascade Shuanggou water power station A large number ice is discharged through the diversion tunnel during the engineering construction. 松江河梯级双沟水电站大坝导流采取一次拦断河床,隧洞导流的方式,工程施工期间,大量冰块将通过导流洞排泄。
- Divers persons were present, of all stations in life. 不同身份的、形形色色的人都出席了。
- Large underground hydropower stations always combine the diversion tunnel and tailrace system to reduce construction quantity,speed up construction schedule and save project cost when designing. 大型地下水电站设计中常将施工导流洞与水电站尾水系统相结合,以减少工程量,加快施工进度,节约工程投资。
- Large underground hydropower stations always combine the diversion tunnel and tailrace system to reduce construction quantity, speed up construction schedule and save project cost when designing. 摘要大型地下水电站设计中常将施工导流洞与水电站尾水系统相结合,以减少工程量,加快施工进度,节约工程投资。
- This system is applied to analyze the stability of surrounding rock in diversion tunnel of the Daliushu Hydro Project.The application shows that the system is effective and practical. 该评价方法被应用到黄河大柳树水电站导流洞围岩稳定性综合评价中,其结果得到了实际工程的检验,说明该方法有一定的适用价值。