Large underground hydropower stations always combine the diversion tunnel and tailrace system to reduce construction quantity, speed up construction schedule and save project cost when designing.

 
  • 摘要大型地下水电站设计中常将施工导流洞与水电站尾水系统相结合,以减少工程量,加快施工进度,节约工程投资。
今日热词
目录 附录 查词历史