deep impact layer

 
  • 深厚冲积层

deep impact layer的用法和样例:

例句

  1. The mine shaft sinking with a mine shaft drilling is a reliable mine shaft construction method to pass through a deep and thick alluvium.
    钻井法凿井是通过深厚冲积层最可靠的竖井施工方法。

deep impact layer的相关资料:

临近单词

今日热词
目录 附录 查词历史