您要查找的是不是:
- dam abutment deformation 坝肩变形
- Analysis of the Right Abutment Deformation Data of Shimen Arch Dam 石门拱坝右坝肩变形观测资料分析
- With the maximum dam height of 292.0m, the excavation of dam abutment formed a side slope as high as more than 400m, whose stability is of vital importance to the dam safety. 小湾拱坝最大坝高292.;0m;坝肩槽开挖所形成的高边坡达400多米;其稳定性至关重要。
- Deformation analysis on the cracks at the left dam abutment of Lubuge dam 鲁布革大坝左岸裂缝变形分析
- When the rock mass of dam abutment is enclosed by faults, joint fissures and bedding planes, it is necessary to carry out holistic anti-slide stability analysis in order to make the abutment withstand potential slide. 摘要当拱垻垻肩岩体为断层、节理裂隙、层面等结构面所围成,有可能産生滑移时,就应进行整体抗滑稳定分析。
- The paper introduces the project general arrangement, the selection of dam boy shape, the stress analysis, the stability against sliding of dam abutment and the foundation treatment. 文章介绍了工程总体布置、大坝体型选择、应力分析、坝肩抗滑稳定和基础处理。
- It is indicated that the dynamic amplification of abutment rock body and dam-water-foundation interaction should be considered in the aseismatic stability analysis for high arch dam abutment. 指出高拱坝坝肩稳定分析应考虑坝肩岩体的动力放大和坝-地基-库水的动力相互作用,算例表明所提方法的实用价值。
- Considering that the right abutment of Dongping arch dam is located at a narrow massif with high ground water, the problems about reservoir leakage and dam abutment stability are concerned with. 洞坪双曲拱坝两岸坝肩天然地下水位较高,右坝肩被河道切割临空而相对单薄且存在可能滑移体。坝址区渗流特性及两岸坝肩的稳定性是工程非常关心的问题。
- It is pointed out that the stability of the dam abutment is a key factor affecting the safety of concrete arch dams. 摘要指出可能影响混凝土拱坝安全的关键点为拱坝坝肩的稳定。
- High Arch Dam Abutment Aseismatic Stability Study 高拱坝坝肩抗震稳定研究
- left dam abutment of Yonghe Reservoir 永利水库左坝肩
- Study on thrust angles of high arch dam abutment during overloading 超载过程中高拱坝坝肩推力角的研究
- STOCHASTIC STABILITY ANALYSIS OF ARCH DAM ABUTMENT ROCK 拱坝坝肩岩体随机稳定性分析
- Study on Xiaowan Arch Dam Abutment Reinforcing Schemes 小湾拱坝坝肩加固方案研究
- Analysis method on stability reliability of arch dam abutment 拱坝坝肩稳定可靠度分析方法探讨
- The dam burst under the weight of water. 那水坝在水的压力下决口了。
- The village was swept away when the dam burst. 村庄在水坝决堤时被冲走了。
- A water power station must have a dam. 水电站必须有拦河坝。
- In case of flood, the dam can protect us. 在发洪水的时候,大堤可以保护我们。
- abutment deformation 坝座变形