When the rock mass of dam abutment is enclosed by faults, joint fissures and bedding planes, it is necessary to carry out holistic anti-slide stability analysis in order to make the abutment withstand potential slide.

 
  • 摘要当拱垻垻肩岩体为断层、节理裂隙、层面等结构面所围成,有可能産生滑移时,就应进行整体抗滑稳定分析。
今日热词
目录 附录 查词历史