top soil construction

 
  • 頂管施工

top soil construction的用法和樣例:

例句

  1. Slurry pipe jacking was firmly established as a special method for the non-disruptive construction of the underground pipelines of sewage systems.
    頂管施工泥漿被堅定地確立為一種特殊的方法非破壞性建設的地下管線的污水處理系統。
  2. Based on site measurement, analysis is made of the ground loss and surface settlement of the embankment, and the reconsolidation settlement of the disturbed soil.
    本文以該工程的實測沉降為依據,分析了頂管施工過程中所產生的地層損失和堤面沉降,分析了受擾動土體的再固結沉降。

top soil construction的相關資料:

臨近單詞

今日熱詞
目錄 附錄 查詞歷史