您要查找的是不是:
- asphaltic concrete lining 沥青混凝土衬砌
- The network of asphalt concrete mixer. 沥青搅拌设备网。
- Asphalt Concrete with Gilsonite[J]. 付海英;谢雷东;等.
- Asphalt or asphaltic concrete, is a mixture of asphalt and aggregates. 沥青或沥青混凝土,是沥青混合料。
- The core wall of asphalt concrete with placement was applied to low clam. 浇筑式沥青混凝土心墙多用于低坝,易于施工。
- The high chromium cast iron can be used for lining board in asphalt concrete mixer. The abrasive resistance of the lining board is 14 times higher than that of low alloy white cast iron. 用铸态马氏体高铬铸铁制造的沥青混凝土搅拌机衬板耐磨性是低合金白口铸铁衬板的14倍多。
- Providing and laying asphaltic concrete wearing course including all labor,materials and machinery with all leads and lifts etc. 请问以下划线部分是什么意思,望那位高手能帮忙指点一下。谢谢。
- Various types of companies existing concrete lining of steel formwork car, rail, trolley concrete delivery tanker. 公司现有各类型混凝土衬砌钢模板台车,有轨,无轨混凝土输送罐车。
- But for the Poured Asphaltic Concrete (PAC), it is only in the testing stage and lacks systematic a anlyses and prototype observations. 而浇筑式沥青混凝土处于试验阶段,缺少系统地研究和原型观测。
- An anticorrosion method of using modified water glass concrete lining of furan resin for saturators is introduced. 介绍了一种对饱和器采用呋喃改性水玻璃混凝土衬里的防腐蚀方法。
- Since 1970 "s, ten and more Poured Asphaltic concrete core Rockfill Dams (PCRD) have been built in the northeren region of China. 自七十年代以来,我国北方地区已建成浇筑式沥青混凝土心墙堆石坝十余座。
- We have used needle beam telescoping steel form in the Mao-Gong reservoir sediment tunnel in the concrete lining. 在庙宫水库排沙洞的衬砌施工中使用了针梁式混凝土衬砌钢模台车。
- With the rapid increase of the mileage of asphalt road,segregation of the asphaltic concrete is therefore becoming increasingly prominent. 鉴于目前高速公路沥青路面通车里程快速增加的同时,沥青混合料离析这一难题也日益突出。
- The practice shows that it is effective to decrease the cracking of the concrete lining slab through the active adoption of those measures. 实践证明:通过采取积极的预防及控制措施,对减少混凝土衬砌板裂缝的产生是非常有效的。
- Since asphaltic concrete materials are temperature dependent in nature, measured deflections and hence the structural capacity of pavement vary with temperature . 由于沥青混凝土材料强度的温度依赖性,弯沉以至路面结构承载能力都随温度而变化。
- It is difficult to analyze combined work of underground penstock due to the gap among steel lining, concrete lining and rock. 摘要埋藏式压力钢管设计中,钢衬、混凝土衬圈和围岩之间普遍存在着不连续的缝隙,致使设计计算时难以进行联合受力分析。
- For concrete lining construction of long inclined shaft with sleep obliquity and big diameter, the construction technology is complex and difficult. 摘要陡倾角大直径长斜井混凝土衬砌施工技术复杂,施工难度特别大。
- It is one of the efficient impervious structure of pouring asphalt concrete used for the RCCD and the serious seepage dam in the recent years. 浇筑式沥青混凝土是新建碾压式混凝土坝和渗漏严重的病险坝修补的一种有效的防渗结构。
- The quality control of asphalt concrete pavement of high grade highway involves layers of cushion, base and surface. 高等级公路沥青混凝土路面施工质量控制包括垫层、基层和面层施工质量控制。
- Because two tailrace tunnels of Laxiwa Hydropower Station are big in its diameter,the concrete lining adopted the way of "first bottom and then side and top arch". 拉西瓦水电站两条大洞径的尾水洞,采用先底拱、后边顶拱的混凝土浇筑方式。