But for the Poured Asphaltic Concrete (PAC), it is only in the testing stage and lacks systematic a anlyses and prototype observations.

 
  • 而浇筑式沥青混凝土处于试验阶段,缺少系统地研究和原型观测。
今日热词
目录 附录 查词历史