您要查找的是不是:
- For the ram compaction piles with composite bearing base, the speed of drawing pipe must be controlled, so as to avoid the gapping or the cut-off. 在复合载体夯扩桩的施工过程中,一定要控制好拔管速度,以免出现缩颈或断桩现象。
- Application of ram compaction pile with composite bearing base in foundation processing 复合载体夯扩桩在地基处理中的应用
- rammed compaction pile 夯扩桩
- During my four academic years. I made good grades on all courses. 在校4年学习期间,各门功课均为优良。
- Times and sequence of roll or ram compaction must be correct to ensure that earth compaction degree meets the requirement. 碾压或夯实的遍数和顺序必须正确,以保证土方密实度符合要求。
- Diplomas were conferred on the students who had completed all courses of study. 修完全部课程的学生被授予毕业证书。
- Completion of each gravel compaction pile shall be checked and accepted by the Engineer at site. 每段砾石压实完成均需工程师进行现场检测和确认。
- An example of consolidating soft foundation using lime-soil compaction pile in construction is introduced. 介绍了用灰土挤密桩加固软弱地基的一个工程实例。
- Research purposes: It required of selecting an effective method for testing and identifying result of subgrade treated by compaction pile. 研究目的:要准确判断挤密桩处理地基的效果,就需要选择一种有效的方法进行测试。
- It is a requirement that all course fees are paid on enrolment. All fees are paid in Australian Dollars. 要求所有的课程费必须在注册时付清,全部费用均用澳元支付。
- All course fees are nonrefundable and must be paid in advance of a student commencing school. 所有学费都必须在开课之前支付,支付后无退款。
- The successful application of lime-soil compaction pile provides an economical and reliable method for ground treatment of high-storey building in loess area. 灰土挤密桩的成功经验,为黄土地区高层建筑地基处理提供了一种既经济又可靠的方法。
- Combined with the engineering practice,the paper discussed the construction technology and quality control measures of macadam compaction pile treating with soft subgrade. 针对日照市南沿海公路软基加固的工程实践,探讨了采用挤密碎石桩处理软弱地基的施工工艺和工程质量控制措施。
- During my four academic years,I made good grades on all courses. 在校4年学习期间,我各门功课均为优良。
- Based on managing and patticipating in all course that drug distributors enforced GSP,summed up experience,included methods,maked suggestions. 通过参与主持药品批发企业实施GSP的全过程,总结经验,提出建议。
- All courses are geared to cater to the business needs. 课程的设置都一昧迎合市场的需要。
- This paper has also chosen two concrete cases to analyze the all course of social mobilizing in order to support the analysis of preceding paragraphs. 本文还选取了两个具体的案例,分析社会动员过程中,工会、资方、政府、其他社会团体及个人的表现,并对工会意义建构的过程进行分析,以支持前文的分析。
- Including: The tuition fee of20/10 days training, logistics and equipment, lunch and dessert, all course materials and the license for proper internal use. 包括:20天(带)10天(级绿带)培训费用,场地费用,中餐和茶点,供学员公司内部使用的教材版权和全部讲义费用。
- All course participants will present the results of their independent research project for assessment by their fellow students and a panel of visiting experts. 所有参加本课程的学员将展示各自的调查项目,并由其他学员与应邀参加的专家评审团对其结果进行评定。
- Because of soil squeezing effect and excess pore water pressur,reconsolidation settlement will occur around soil compaction piles in saturated soft clay during pile driving. 位于饱和软粘土地基中的挤土桩,由于沉桩过程中地基土产生挤土效应及超静孔隙水压力,同时随着超静孔隙水压力的消散,桩周地基土产生再固结沉降。