For the ram compaction piles with composite bearing base, the speed of drawing pipe must be controlled, so as to avoid the gapping or the cut-off.

 
  • 在复合载体夯扩桩的施工过程中,一定要控制好拔管速度,以免出现缩颈或断桩现象。
今日热词
目录 附录 查词历史