您要查找的是不是:
- after heat boiler 余热锅炉
- The diffculties and treatments in integral hoisting of the import waste heat boiler after the thrdd pieces of equipment be pre-assembled were introduced. 介绍了进口废热锅炉三台单体设备经预组装后,在进行整体吊装组对时存在的技术难点及处理办法。
- Straightening of the shaft after heat treatment is a key process. 在轴杆类零件生产过程中,热处理后校直是一道关键工序。
- The central heating boiler is in the basement . 中央供暖系统的锅炉设在地下室。
- This paper reports that based on theroetical calculation and research, by using heat tube, heat along with flue gas after waste heat boiler,with should emmit into atmosphere, can be recoverd. 对经过余热锅炉后排放到大气中的烟气所带走的热量,应用热管技术进行回收作一个理论上的计算与探讨。
- The central heating boiler is in the basement. 中央供暖系统的锅炉设在地下室。
- Aluminum foil must not crease after heating. 铝箔在加热后不得起皱。
- The waste heat boiler of sinter ring cold machine was developed to recover sensible heat of sintering mine. 为回收烧结矿显热,研制出烧结环冷机余热锅炉。
- This paper introduced a non-ferrous metals metallurgy new technolgy-fuming furnace and waste heat boiler process. 本文介绍一种重有色冶金新工艺,烟化炉-余热锅炉的研制过程。
- Excellent color gloss retention after heat aging Excellent chalk and moisture resistance. 高温下之色泽及光泽保存性、抗粉化性及湿气性。
- This paper introduced a high efficiency elasticity vibrating deduster for Waste heat boiler. 本文介绍一种高效的余热锅炉弹性振打除灰机,具有一定的推广价值。
- Favorable Pressure Proof Strength Before and After Heating. 受热前后均有良好的抗压强度。
- The linear change after heating may be reduced by adding kyanite. 蓝晶石能有效地抑制涂料的高温收缩。
- This article introduces combustion processand wiping dust technique for airtight acetylene furnance,which tail gas directly enters waste heat boiler. 本文介绍了将密闭电石炉尾气直接引入余热锅炉燃烧过程及其除尘技术。
- Large area of spalling accured on the work layer of high-Crcentrifugal cast iron roll after heat treatment. 高铬离心复合铸铁轧辊辊身工作层在热处理后发生大面积剥落。
- The residual heat boiler of the full-enclosed calcium carbidefurnace has been developed in China.But the dedusting question hampers its development. 密闭电石炉余热锅炉在我国得到了较好的发展,但除尘问题不过关成为其发展的一大障碍。
- After heat acclimatization the sweat Ca and Mg contents were reduced by 34 6% and 36 8% respectively(P<0 05). 热习服后 ;汗钙、镁浓度分别降低 34 6%25和 36 8%25 (P <0 0 5 ) ;全天流失量分别减少 1 1 2mg和 1 9 6mg。
- The optimisation of water dynamics of waste heat boiler for a 300 kt/a sulphur-burning sulphuric acid plant is described. 介绍300 kt/a硫磺制酸装置废热锅炉的水动力优化设计。
- After heat acclimatization,the serum Ca lowered to below the normal and the Mg also reduced by 7 7%(P<0 05). 热习服后 ;血清钙降至正常值以下 ;镁也下降 7 7%25 (P <0 0 5 ) ;
- It expatiaes the technology of reclaiming and utilizing gas from airtight calcium carbide stove by use of waste heat boiler. 阐述了采用废热锅炉回收利用密闭电石炉气的工艺技术,论述了该工艺技术在经济效益和环境效益方面的积极意义。