The diffculties and treatments in integral hoisting of the import waste heat boiler after the thrdd pieces of equipment be pre-assembled were introduced.

 
  • 介绍了进口废热锅炉三台单体设备经预组装后,在进行整体吊装组对时存在的技术难点及处理办法。