您要查找的是不是:
- Power staion at dam toe 坝后式水电站
- power station at dam toe 坝后式水电站
- Main contents and results are as follows:(1)To evaluate dam toe line is of vital importance in dam computer auxiliary design, however, its evaluation traditionally adopts graphic solution. 求解堤坝坡脚线是堤坝计算机辅助设计中一个十分重要的工程问题,而这一问题的求解一直采用传统的图解法。
- Over the past two years Stanley collected data at dam sites, both before and after their removal, along the Baraboo River and Koshkonong Creek in Wisconsin. 在过去两年内,史坦利于威斯康新州内的巴伯若河及哥许哥侬溪沿岸,在即将拆除的水坝场址收集资料,并于拆毁后再进行一次调查。
- With the increase of cutoff wall's extending length, maximum seepage gradient of sand layer and seepage gradient of exit surface gradually decrease in the cross section of left bank near the dam toe. 随着防渗墙延伸长度的增加,坝趾处左岸横断面砂层的最大渗透坡降及出逸面的渗透坡降均逐渐减小;
- The principles of arch dam foundation treatment design are expounded in combination with engi-neering geology condition at dam site of Ertan Hydroelectric Plant. 结合二滩水电站坝址区工程地质条件,阐明拱坝基础处理设计的原则,全面介绍了基础处理设计中采用的主要工程措施和先进技术。
- A water power station must have a dam. 水电站必须有拦河坝。
- Numerical method of dam toe line and study of visualized drawings 堤坝坡脚线数值解法及图形可视化研究
- People came in flocks to see the new hydraulic power station beside the dam. 人们成群结队地来参观水坝旁边新建的水电站。
- Supervision for grouting construction under the dam toe slab 大坝趾板灌浆施工监理
- The king was shorn of his power by his nobles. 国王被手下的贵族们剥夺了权力。
- The power machine will be switched over at midnight. 发动机将在午夜被开动供换电。
- The Dam Toe Grouting Technique of the Left Bank of Shuibuya Hydropower Station 水布垭水电站大坝左岸趾板灌浆技术
- Study on the stability of slope-sliding body in dam toe and banks near the dam 坝址及近坝库岸滑坡体稳定性研究
- Open tender for purchasing power transformer. 公开招标购买电力运输设备。
- James unleashed his power on Susan in revenge. 杰姆斯利用权力报复苏珊。
- Industry is a heavy user of electric power. 工业需耗费大量的电力。
- He flared up at such abuses of power. 他怒斥这种滥用职权的行为。
- There was a power cut and all the lights went out. 因停电所有的灯都熄灭了。
- Remake of trashrack at dam intake 拦河坝进水口拦污栅的改造