您要查找的是不是:
- Performance Analysis of an Irreversible Quantum Otto Power Cycle 不可逆量子气体奥托热机循环性能分析
- Otto power cycle 奥托热机
- A reset or power cycle occurs if the AP remains in the INIT state for more than 8 minutes. 如果 AP 在 INIT 状态下持续的时间超过 8 分钟,则会出现重启或循环通电。
- A power station operates using a closed steam power cycle, where water undergoes various thermodynamic processes in a cyclic process. 电站通过使用一个封闭的蒸汽动力循环来实现运行,在循环的过程中水经历了各种热力过程。
- A combined power cycle with LNG cold energy recovery consisting of Rankine cycle using ammonia-water as working fluid, power cycle of combustion gas, and LNG cycle, was presented. 摘要提出了以氨水为工质的朗肯循环、燃气动力循环和液化天然气循环组成的混合动力循环系统,用于液化天然气冷能回收。
- (5) Power cycle: Otto cycle, Diesel cycle, Brayton cycle, Rankine cycle. (5) 动力循环:奥图循环,狄塞尔循环,布雷登循环,郎肯循环。
- An AP may also temporarily indicate UNAVAILABLE during power cycles. 在循环通电期间,AP 也会暂时指示为 UNAVAILABLE。
- The universal expressions for the efficiency and the output work of the Ericsson power cycle working substance with ideal Bose gas 4He are determined by using the corrected equation of state. Some interesting discussions are done. 利用修正的理想气体状态方程推导出以理想玻色气体 4He为工作物质的量子埃里克森热机效率和输出功的普遍表达式 ;并对结果进行一些有意义的讨论 .
- Base on the combined power cycle model provided by literature,this paper established a model of combined carnot and rankin cycle model with heat resistance,heat leakage and supplemental combustion. 在原有的联合循环模型的基础上,建立了一个存在热阻、热漏和补燃的卡诺和朗肯联合循环热机模型。
- The king was shorn of his power by his nobles. 国王被手下的贵族们剥夺了权力。
- Ideal Otto cycle is introduced in chapter four. 第四章阐述了理想奥托循环的过程。
- Advanced coal-combustion power cycles, such as IGCC, PFBC-CC and so on, are of high efficiency and low pollution. 以煤为燃料的IGCC和PFBC-CC等新型动力循环,具有高效率、低污染等优点。
- The different loading sete for four-square power cycling gear-box test stand are described in this paper. 介绍了功率封闭齿轮箱试验台的各种加载机构。
- On Power Cycle Theory in International Politics 国际政治的权力周期理论初探
- The combination of limited thermal management and frequent power cycling is particularly challenging for complex processors like the GPU. 结合有限的散热管理和频繁发生的权力,骑自行车是特别具有挑战性的复杂的处理器一样, GPU的。
- Before power cycling the system, try to get into RMC mode (Esc Esc RMC) and use RMC commands to check the system status. 为帮助我们改进内容,请提供以下反馈意见和附加评论。
- Open tender for purchasing power transformer. 公开招标购买电力运输设备。
- James unleashed his power on Susan in revenge. 杰姆斯利用权力报复苏珊。
- Industry is a heavy user of electric power. 工业需耗费大量的电力。
- There was a power cut and all the lights went out. 因停电所有的灯都熄灭了。