您要查找的是不是:
- 南京地铁一号线BAS系统NANKING SUBWAY NO. 1 LINE BAS SYSTEM
- 通过广州地铁二号线和南京地铁一号线的工程实例,介绍了单层衬套防水系统和单层分区注浆衬套防水系统在国内的应用。Taking Guangzhou Underground Line 2 and Nanjing Underground Line 1 as examples? the article introduces application of single layer bush waterproofing system and single layer zoning grouting bush waterproofing system domestically.
- 你可以坐21路公车或者地铁一号线。Sure, you can take bus number 21, or subway line one.
- 沈阳地铁一号线车辆段选址及方案研究Study on the Address-Choosing of Depot for Line One of Shenyang Metro
- 重庆单轨FAS及BAS系统车站级网络集成实践Network Integration of FAS And BAS Systems at Station Level for Monorail in Chongqing
- 广州地铁一号线列车溜行故障的分析及改进Analysis and improvement of rolling fault on the train of Guangzhou Metro Line
- 南京地铁1号线一期工程施工的招投标工作The Bidding Works in the Project Construction of Nanjing Metro Line 1 First Stage
- 广州地铁一号线Guangzhon Metro line 1
- 南京地铁1号线车辆主传动系统问题分析Analysis on Major Issues of Main Transmission System of Cars for Nanjing Metro Line 1
- 只要为了实现一些明确的目标,如更好的武器或军事运输系统,美国政府愿意花钱研究。The government was willing to pay for research only to meet certain clear goals, such as better weapons or military transport systems.
- 欢迎乘坐成都地铁一号线。Welcome to Line one of Chengdu Metro.
- 南京地铁一号线南京站Nanjing No. 1 subway Nanjing station
- 沈阳市地铁一号线Shenyang No. 1 Subway
- 2006年7月31日,一桶冰块被放置在老型号的地铁一号线车内。July 31th in 2006, a pail of ice-cubes was place in the subway No.1 line car of the old model number.
- 号线一期工程系统总联调的进度控制Schedule Control in System Integrated Test in the First Stage of Construction of Nanjing Metro Line
- 广州地铁一号线轨底坡调整Regulation of Rail Cant for Guangzhou Metro Line
- 武汉轨道交通1号线一期工程信号系统的移动闭塞技术Moving Block Technique in the Signal System of Wuhan URT Line 1
- 成都地铁一号线列车开行方案研究Research on the open to traffic plan for metro No. One in Cheng Du
- 上海市地铁一号线隧道变形测量及规律分析Deformation Measuring of the Metro Tunnel and Deformation Data Analysis of Shanghai Metro Line No. 1
- 下一站:广都,这是一号线终点站。The next station: Guang Du, end of Line one.