您要查找的是不是:
- Comprehending WBS and work breakdown structure system. 5理解WBS及工作分类结构系统;
- work breakdown WBS 工作分解WBS
- In project management, a work breakdown structure (WBS) is a method for analyzing a project's activities. 在项目管理中,工作分析结构(WBS)是用来分析项目活动的方法。
- A typical tool that is used by project managers is the work breakdown structure (WBS). 项目经理使用的典型工具是工作分解结构(WBS)。
- NPI Project leader will create WBS (work breakdown structure) with team member ASAP. 新产品导入领导人将和小组成员一起创建工作分解结构,明确职责。
- With Project, you can represent the work breakdown structure by using task IDs or by assigning your own WBS code to each task. 使用Project,可通过使用任务标识号或者向每项任务分配自己的WBS代码来表示工作分解结构。
- Work breakdown structure (WBS) (WBS: A hierarchical structure that is used to organize tasks for reporting schedules and tracking costs. 工作分解结构(WBS)(WBS:一种用于组织任务以便报告日程和跟踪成本的分层结构。
- If you created a WBS code mask (code mask: The format that you define for a work breakdown structure [WBS] code or a custom outline code. 如果您创建了WBS代码掩码(代码掩码:您为工作分解结构(WBS)代码或自定义大纲代码定义的格式。
- Create a work breakdown structure code if you want to create your own WBS code mask that specifies the structure of WBS codes for your project. 创建工作细分结构代码-如果希望创建自己的WBS代码掩码以指定项目WBS代码的结构。
- In SAP there are threetypes of cost objects: Cost Center, Internal Order, and WBS(Work Breakdown Structure) Element (see below for definition). 在SAP里有三种成本对象:成本中心、内部订单、WBS要素(项目管理)。
- What is a work breakdown structure? 什么是工作分析结构?
- CWBS Contract Work Breakdown Structure? 合同工作分解?
- Key Job Functions-Develops Work Breakdown Structure (WBS) in conjunction with Project Management Team and Team Leaders. ...... ... 公司名称:爱思特信息技术(上海)有限公司工作地点:上海市发布时间:2009-7-15
- Based on work breakdown structure (WBS), technical risks were identified and technical risk breakdown structure (TRBS) can be set up. 因为场馆建设过程中使用的技术和材料等比较新颖,因此缺乏历史数据和经验。
- WBS is also known as work breakdown system. it is a map of the project that identifies the products and work elements involved in a project. WBS 是面向项目可交付成果的成组的项目元素,这些元素定义和组织该项目的总的工作范围,未在WBS中包括的工作就不属于该项目的范围。
- Renumber custom work breakdown structure codes when you move or delete tasks and you want to reset the custom WBS field so that your tasks match the new structure. 重新编号自定义工作细分结构代码-如果要移动或删除任务,并重置自定义的WBS域使任务与新的结构相匹配。
- You can also create a work breakdown structure (WBS: A hierarchical structure that is used to organize tasks for reporting schedules and tracking costs. 也可以创建工作分解结构(WBS:一种用于组织任务以便报告日程和跟踪成本的分层结构。
- After you have outlined tasks, you can also show the structure of your project by using built-in or customized work breakdown structure (WBS) codes or outline codes. 有了大纲任务之后,还可以使用内置或自定义的工作分解结构(WBS)代码或大纲代码来显示项目的结构。
- Create a work breakdown structure from tasks in Microsoft Project. 在Microsoft Project中基于任务创建工作分解结构。
- You can develop a work breakdown structure(WBS),categorize activities into distinct groups using activity codes, or divide a large project group into smaller, individual projects. 一个工程类句子的翻译不知下面这句如何翻译?哪位大虾来指点一下。谢谢!