您要查找的是不是:
- This is typically done to optimize server and network traffic load. 通常,这样可以优化服务器和网络的通信负载。
- A traffic load forecast model by optimally combined Markov chain is presented. 提出了一种基于最优组合马尔柯夫链的业务量预测模型 .
- During light traffic loads, perceived workload may decrease below the minimum needed to maintain attention and alertness. 在处于低负荷工作强度时,管制员感受到的工作压力可能下降到要保持足够的注意力和警觉的最低要求以下。
- As a result,these switches have the ability to track content requests and predict heavy traffic loads before servers become overwhelmed. 因此,这些交换机具有跟踪内容请求和在服务器崩溃之前预测流量负荷之能力。
- Demand for gigabit Ethernet is likely to heat up as more LANs move to 100Base-T,putting huge traffic loads on backbone networks. 随着更多的局域网向100Base-T转移,从而使更大的信息流量加载到骨干网上,对千兆位以太网的需求可能加剧。
- During light traffic loads,perceived workload may decrease below the minimum needed to maintain attention and alertness. 在较少交通量时,管制员感受到的工作压力可能下降到要保持足够的注意力和警觉的最低要求以下。
- Demand for gigabit Ethernet is likely to heat up as more LANs move to 100Base-T, putting huge traffic loads on backbone networks. 随着更多的局域网向100Base-T转移,从而使更大的信息流量加载到骨干网上,对千兆位以太网的需求可能加剧。
- As a result, these switches have the ability to track content requests and predict heavy traffic loads before servers become overwhelmed. 因此,这些交换机具有跟踪内容请求和在服务器崩溃之前预测流量负荷之能力。
- Aiming at the pipelines under traffic loads, this paper thought the invalidation of the pipelines under traffic loads as a fuzzy thing. 以受交通荷载作用的埋地管道为研究对象,认为受交通载荷作用下管道的失效是一个模糊随机事件。
- The traffic load caused by the many disassociated pieces of suburbia is most clearly visible from above. 由此可见,由这些不相关的部件拼凑起来的郊区的交通流通量是不言而喻的。
- However,reflection crack occurs in these new overlays due to the movement of existing pavements under environmental or traffic loads,and/or a combination of both. 这种修复方法最主要的问题是加铺层反射裂缝的形成,即原路面中存在的裂缝在交通荷载、环境因素以及二者的共同作用下扩展并延伸到新的面层中。
- This stiffening is necessary to resist deformations of the deck of the bridge due to moving traffic loads and also to resist lateral pressures from wind. (这种加筋系统对于消除桥板动载变形以及风载侧向压力是必须的。)
- Increasing demands on our pavements-new axle configurations, higher tire pressures and increased traffic loads and volumes are pushing asphalts performance to its limits. 对我们新型车道轴的构造日益增加的要求、更高的轮胎压力和越来越大的交通负荷总量正将沥青的性能推向其极限。
- Each signaling link may accommodate a traffic load of approximately 40 percent of its maximum load capacity. 每一信令链路可容纳其接近最大负载能力 40%25 的话务量。
- In this work, the traffic load model based on measurements of real traffic loads in Shanghai was used to make bridge reliability assessment and posting analysis. 本文通过对上海市车辆荷载情况的调查和统计分析,建立了上海市城市桥梁交通荷载模型,并利用此模型对典型桥型进行了可靠度评估和限载研究。 具体工作包括以下几个方面:
- When the traffic load increase remarkably, DTEE MAC can bear the increased traffic load through extend wakeup time. 在网络负载显著增大时,通过增加唤醒时间来提供适合的带宽来承载增大的网络负载。
- We study the effect of active/sleep transition rates, traffic load, and error rate on those performance metrics. 我们研究作用/睡眠转移速率,流量负载,与错误率对于该等效能指标之影响。
- More could be done to encourage flexible working hours and spread the traffic load. 可采取更多措施,鼓励灵活的工作时间,分散交通负荷。
- With the power spectral density, the vibration mechanism and the vibration transfer process of viaduct caused by the traffic load were introduced. 摘要从功率谱的角度介绍城市高架桥梁在交通荷载下产生振动的机理和振动的传递过程。
- Once established,a DTM channel provides guaranteed service,and,depending on the channel's traffic load,the capacity of the channel can be altered during operation. DTM信道一旦被建立起来了,就提供获得保证的服务,并且依据信道的流量负荷,信道的容量可以在工作当中进行调整。
