您要查找的是不是:
- Cathay Project Risk Management Co., Ltd. 华澳工程风险技术咨询有限公司。
- Adopt iterative development practices that reduce project risk. 采取些减少项目风险的反复开发实践。
- Engineering project risk is very popular in reallife. 现实生活中,建设工程项目面临着很多风险。
- Support requested from the TI Program as percentage of total project cost. 需要技术进步项目支持的资金占项目总成本比例。
- This gives the team a chance to learn on the job and minizes project risk. 这可以让项目组成员有机会学习这项工作并减少项目风险。
- Assessing and mitigating project risks. 评估并减轻项目风险;
- You can identify tasks or resources with budget risks and adjust the task or resource costs to bring the total project cost within budget. 可以确定具有预算风险的任务或资源,调整任务或资源成本以便将项目总成本控制在预算内。
- The consecutive sequence of activities in a project whose cumulative time requirements determine the minimum total project time. 一个项目中的连续活动程序,累计时间要求决定最短项目总计时间。
- Reporter : So in fact have caused Wanda into CBD, and face the many opponents Wang also show how the total project compete with them ? 记者:那么事实上已经造成万达涉足CBD,而面对众多的对手王总又拿出怎样的项目与其竞争呢?
- In addition, exchange rate fluctuations also increased the total contracted overseas engineering project risks. 此外,汇率的波动也加大了海外工程总承包项目的风险。
- It is important to analysis project information to feedback, to prevent project risk in control phase. 控制阶段是对项目信息的深入分析与挖掘,及时反馈,以预防项目风险。
- The total project cost of the expansion which opened in 1997 was HK$4.8 billion (US$620 million, in 1997 dollars) including site reclamation which began in June 1994. 扩建工程共耗资48亿港元(6.;20亿美元,1997币值),其中填海工程于1994年6月展开。
- From the angle of the project risk, the grey fuzzy theory is adopted to appraise the risk. 摘要从工程项目风险分析的角度,采用灰色模糊理论对工程项目风险进行评价。
- The scientific decision makes the project risk lower and the success rate exalted. 科学决策的规范运用使项目风险降低,成功概率大大提升。
- Facilitate obtaining required schedule information by all disciplines. Works with all departments to ensure an understanding of the total project scope and schedule. 按规定收集获取推进工程所需信息,和所有相关部门协同合作,确保其对整个项目范围和安排的理解。
- To control the huge risk by the commercial bank directly participate in the project risk management. 通过商业银行直接参与项目的风险管理来控制其承受的巨大风险。
- Accordingly, this research, based on a project risk management at a bidding stage, has an important practice value. 因此,本文选取工程项目在投标阶段的风险管理开展研究具有重要的实践价值。
- Technical project risk management has always been given great concern by the Department of Defense of the United States of America (DoD). 技术项目的风险管理一直深受美国国防部的重视。
- However the ineffectiveness of traditional tools and techniques in dealing with project risk dynamics calls for new approaches. 然而项目风险的动态复杂性使得传统方法与技术不能有效地识别和应对项目风险。
- Against this background, engineering companies to obtain continuing competitive advantage, successively introduce and absorb advanced project cost management theory and methods, EPC works as an important means of the total project management contract . 在此背景下,工程公司为获取持续竞争优势,纷纷引进和吸收先进的项目成本管理理论和方法,作为EPC工程总承包项目管理的重要手段。