top soil construction的用法和样例:
例句
- Slurry pipe jacking was firmly established as a special method for the non-disruptive construction of the underground pipelines of sewage systems.
顶管施工泥浆被坚定地确立为一种特殊的方法非破坏性建设的地下管线的污水处理系统。 - Based on site measurement, analysis is made of the ground loss and surface settlement of the embankment, and the reconsolidation settlement of the disturbed soil.
本文以该工程的实测沉降为依据,分析了顶管施工过程中所产生的地层损失和堤面沉降,分析了受扰动土体的再固结沉降。