您要查找的是不是:
- I blew in order to keep the water cool. 我吹气为了使水凉下来。
- ANALYSIS AND IMPRROVEMENT OF WATER COOLING SYSTEM OF HIGH SPEED WIRE ROD MILL AT NANJING IRON AND STEEL GROUP CO. 南钢高线厂水冷线的分析与改进。
- Water treatment of closed loop soft water cooling system for No.4 BF at Benxi Iron & Steel Co. 本钢4号高炉软水密闭循环冷却系统的水质处理
- Management of closed loop soft water cooling system for 3200m~3 BF at Wuhan Iron & Steel Co. 武钢3200m~3高炉冷却壁软水密闭循环冷却系统的管理
- Let the water cool before you drink it. 把开水晾一晾再喝。
- Binary cooling system is adopted for cooling,with quick cooling effect.The method is water cooling. 冷却采二元冷冻系统,降温效果快速,冷却方式为水冷式。
- And have soft water cooling system , the upright hydraulic pressure quenching machine tool assort that. 并有软水冷却系统,液压立式淬火机床与之配套。
- This article has described the constitution of the ACC water cooling system as well as the control process. 介绍了中厚板轧机ACC水冷装置的设备组成及控制过程。
- Combining the example of engineering, the fire control water cooling system and foam system are described. 结合工程实例,介绍了油库的消防水冷却系统和泡沫灭火系统。
- The author puts forward the following opinions on several discussible problems of closed loop soft water cooling system for blast:furnace. 作者针对高炉软水密闭循环冷却系统存在的几个可讨论性问题提出了如下观点:冷却介质采用软水或纯水都是可靠的;
- Multiple ions composite diffusion coating equipment included furnace body, glow discharge power, arc power, water cooling system, vacuum system and detecting system etc. 摘要多元离子复合渗镀设备是由炉体、辉光电源、电弧电源、水冷系统、真空系统和监测系统六部分组成;
- Modern XXL technology combined with a newspaper business card printing and membership card produced water cooling system, you can save energy that will be used by one third. 现代化的XXL技艺增上报纸制卡和会员卡制作的火寒却编制,可以不兵搁置的能度耗费不一不合之一。
- The workmen fixed the water system. 工人们装好了供水系统。
- Suitable to water cooling systems of various machinery and facilities, e. G. 适用于各种机械及场房设备之水冷式冷却系统。
- Don't forget to chug-a -lug at the water cooler! 所以不要忘记了在饮水机旁一饮而尽。
- De-Yang Wu, ” Performance Evaluation of the Heat Sink in a Water Cooling System”, Thesis for Master of Science Department of Mechanical Engineering Tatung University, June 2003. 游裕杰,”离心式电脑风扇的设计与分析”,国立成功大学机械工程学系硕士论文,2002年6月。
- The cooling system of No.4 blast furnace of Baotou Steel Corp.is analyzed based on measured data on the cooling water flow rate and the water temperature difference. 在对包钢4%23高炉各冷却部位冷却水量和冷却水温差进行全面测试的基础上,分析研究了包钢4%23高炉冷却制度特征。
- Therefore, it is important to analysis heat resources.The author analysis heat characteristics of the HVL in work., and also water cool system is designed. 所以,对系统发热来源的分析显得尤为重要,本文分析了液粘加载器在工作过程中的发热特性,设计了水循环冷却系统。
- I waved my dog to plunge into the water. 我挥手示意我的狗跳入水中。
- The chain has fallen foul of plants in the water. 链条已和水中的植物缠绕在了一起。
