您要查找的是不是:
- An additional step in TMap is discharging the test team. 在TMap中的另外一个步骤正在解放测试团队。
- Let the test team be a hub of for all product quality information. 让测试组成为所有产品的质量信息的交汇点。
- Lead the test team to finish the project onsite/offsite. 工作地点:上海市-(全部)上海市-接受简历语言:发布时间:2008-10-15
- A testing team that lacks diversity. 测试小组缺乏多样性。
- So how should the testing team be staffed? 那么应该如何招募测试团队呢?
- Without a specification, it is impossible for your test team to know what is working right and what is not. 如果没有规范,测试小组便无法知道什么行为是正确的,什么行为是错误的。
- Assisting test team in module testing, integrated testing and system testing. 协助测试小组内完成负责模块测试、集成测试和系统测试。
- The act of creating a new process template will inevitably create many test team projects. 新建过程模板的操作不可避免地会创建许多测试团队项目。
- It's not unheard of for a software test team to create more deliverables than the programmers. 不是没有听说过,一个软件测试团队可以比程序员更让产品具有可交付性(让用户满意)。
- The test team must have some way to set up the product on their computers, even though it might only be a prototype setup. 测试小组必须通过某种方法在他们的计算机上安装产品,即使产品可能还不过是一个原型。
- Test team management and test project management Technical training and guide test team Establish test process and test tools. 测试团队管理;.;对测试团队进行技术培训及指导;
- Technically:I am have test base and software test experience abundant,be capable of analyse company test team,give ameliorate advice. 技术上:测试基础和测试经验丰富,能够分析公司现在的测试团队,给予改进建议使测试团队更规范。
- For this reason, the test team invested some effort in preparing a Java application that would output JMeter XML-encoded test scripts based on specified parameters. 因此,测试团队投入一些精力准备一个Java应用程序,用于根据指定的参数输出JMeter XML编码的测试脚本。
- The Role of Testing: who does the testing team serve, and how does it do that? 测试的作用:谁承担测试小组的责任,如何做?
- The test team used Microsoft Excel spreadsheets to import test results and perform statistical calculations on the elapsed time metrics described above. 测试团队使用Microsoft Excel电子数据表来导入测试结果,并且针对上面描述的耗用时间度量执行统计运算。
- A simple test will show if this is real gold. 简单的试验就能证明这是否是真金。
- To work as part of the test team, testing seats and sub assemblies according the test requirement from test engineer. 根据测试工程师的要求,完成座椅及其零件的测试。
- The test team told me I taxied out to the end of the runway much faster than I did for any of the taxi tests. 测试小组告诉我说我滑跑到跑道头的过程要比我以前进行滑跑试验时快一些。
- He also had one coop rotation at Alcatel Networks working for DSL Hardware design and testing team. 他还曾经在Alcatel Networks的DSL硬件设计和测试小组里工作过。
- Pupils who pass the test will be promoted to the next higher grade. 小学生只要考试及格就会升到高年级。
