您要查找的是不是:
- starting date of a project 开工日期
- For example, Project calculates the duration of a summary task as the total work time between the earliest start date and latest finish date of its subtasks. 例如,Project将摘要任务的工期计算为其子任务的最早开始日期和最晚完成日期之间的总计工作时间。
- It is expected that the starting date of a firm can be agreed upon with the distributors sometime in September. 确定的开张日期当能在9月间与配售商达成协议。
- Starting date of a CDM project activity 清洁发展机制项目活动的开始日期
- What's the start date of the Olympics? 奥运会的开幕日期是几月几日?
- If you paste a start date, you automatically introduce a constraint (constraint: A restriction set on the start or finish date of a task. 如果粘贴了一个开始日期,将自动为该项任务引入一个限制(限制:对任务的开始日期或完成日期设置的限制。
- To change the start date of a task, drag the middle of the task's Gantt bar left or right until the tracking box displays the new start date. 要更改任务的开始日期,请左右拖动“甘特图”中任务条形图的中部,直到跟踪框中显示新的开始日期。
- Move to the beginning of a project (timescale). 移动到项目开始(时间刻度)。
- Move to the end of a project (timescale). 移动到项目结尾(时间刻度)。
- You are planning a project with a start date set to March 1. 您正在计划一个开始日期设置为3月1日的项目。
- How to determine the date of a cultural relic? 怎样鉴定文物年代?
- Represents the completion status of a project. 表示项目的完成状态。
- The full path and name of a project file. 项目文件的完整路径和名称。
- Contents and Layout of a Project Planning Report. 研究计画规划书之内涵和配置。
- Set the start date of the calendar you want to insert. 设定您想要插入的日历的起始日期。
- A preliminary draft or plan, as of a project or proposal. 草案初步的草案或计划,如工程或建议的草案
- By default, all tasks in a project scheduled from the start date have the ASAP constraint applied. 默认情况下,对项目中从开始日期排定的所有任务都应用ASAP限制。
- A projecting brim at the front of a bonnet. 宽前檐一顶女帽前面突出的帽沿
- According to methodology, the starting date of the project activity could be the construction start date or the operation start date. The operation start date is suggested. 项目活动开始日期可以写项目开工日期或项目运行日期,目前倾向于填写后一日期。
- An arch or a projecting arched member of a vault. 圆拱:拱形结构的拱或突出拱形部件。
