您要查找的是不是:
- Well, I have a scheduling problem. 嗯,我在安排工作方面遇到困难。
- Fixed a scheduling problem with the Danish Under 18 leagues. 修正了丹麦18岁以下联赛的赛程问题。
- The DAG scheduling problem has shown to be NP complete in general. 一般情况下,这种DAG调度是个NP完全问题。
- The single machine scheduling problem with continuous resources was discussed. 摘要讨论具有连续资源的单机排序问题。
- A new local search method with hybrid neighborhood for Job shop scheduling problem is developed. 另辟蹊径求解工厂作业调度问题。
- Although the scheduling problem with delay has attracted some attention, the most of them consider only weighted tardiness. 随后,引入延误差函数概念,借助它给出简化的基于延误差函数的排序算法。
- Economic lot scheduling problem(ELSP)is a classical problem in production and inven- tory. 如何安排产品的生产顺序以及生产数量,这一类问题通常称作经济批量排产问题,经济批量排产问题是生产库存中的经典问题。
- A description of construction project scheduling problem with flow processes is given. 首先给出了带流水作业工程项目调度问题的描述;
- Local search is a very important heuristic method for the job shop scheduling problem. 邻域搜索是一种很重要的求解工件加工调度问题的启发式算法。
- A scheduling problem on the single machine with fuzzy processing time is studied. 研究单机模糊加工时间下确定最迟开工时间的调度问题。
- This paper formulates the satellite imaging scheduling problem as a 0-1 integer programming model,which is NP complete. 建立了卫星成像调度问题的0-1整数规划模型,该问题具有NP完全特性。
- This paper studies the MAFS scheduling problem of M+1 machines based on the heuristic algorithm. 摘要时M+1台机器的MAFS排序问题,在该问题的启发式算法的基础上作了进一步的研究。
- W Barnes, J B Chambers.Solving the job shop scheduling problem with tabu search[J].IIE Transaction, 1995,27. 周泓;蔡缪峰;冯允成.;求解流水车间作业排序问题的一种遗传算法[J]
- The (re) scheduling problem based on the model is thus regarded as an optimization selection problem of RT-RAGs. 基于该模型的调度问题归结为RT-RAG的优化选取问题。
- Used in the scheduling problem of a division method, the workpiece 6 to 4 on the same machine, how to allocate. 在调度问题中用到的一个划分方法,把6个工件到4个相同的机器上,如何分配。
- This IGA can also been extended to multi-objective scheduling problems. 这一算法还可以扩展到多目标调度问题。
- To help you identify schedule problems. ,以帮助您确定日程中的问题。
- To resolve resource scheduling problem efficiently in manufacturing grid,a multi-objective optimization model is put forward. 为有效解决制造网格中资源调度问题,提出了多目标调度优化模型。
- In computational grid environments, QoS guided scheduling problem is complex and challenging, especially when the tasks have muldple QoS needs. 实现用户的服务质量QoS是网格的一个重要特征,网格环境下以服务质量为指导的任务调度是一个非常复杂且具有挑战性的问题,特别是在用户的任务具有多种QoS需求的情况下。
- The computational results show that the PSO is a viable and effective approach to solve the semiconductor furnace batch scheduling problem. 实例计算的结果表明,该算法是解决半导体炉管区调度问题可行且高效的方法。