您要查找的是不是:
- rockfill breakwater 堆石防波堤
- They riprapped the breakwater with stone. 他们以乱石基巩固防波堤。
- The breakwater projects far into the sea. 防波堤一直伸向远处的海面。
- Bituminous concrete facings for earth and rockfill. 土石坝的沥青混凝土面层。
- Back of the breakwater the dredger was working. 在防波堤后面挖泥船正在工作。
- The breakwater sustains the shock of the great waves. 防波堤承受巨浪的冲击。
- Steiner and Ilse were at the very end of the breakwater. 施泰纳和艾尔丝呆在港口防波堤的顶端。
- Completed outer breakwater rubble mound to the south. 外廊南防波堤完成之抛石堤。
- Engineer the Contractor shall place rockfill to swamps. 工程承包者应地方堆到沼泽。
- Theory and Practice of Construction Simulation for High Rockfill Dam. 高土石坝施工仿真理论与实践。
- The rocks for Dubai's breakwater have been provided by its neighbour Abu Dhabi. 为迪拜防波堤提供石料的是其邻国阿布扎比。
- The effects of the stratification of rockfill on the seepage field and the stability of the dam slope were highlighted. 指出填料严重分层后对坝体渗流场的影响以及对坝坡渗透稳定性的不利影响。
- The principle and effect of impact compaction, and its application in rockfill subgrade is introduced in this paper. 并对冲击压实的作用原理,压实功效以及冲击压实在填石路基中的应用作了介绍。
- Treatment of breakwater soft foundation by sand bags and dewatering plastic sheet can fully satisfy the project need. 采用袋装砂和塑料排水板的软基处理方法完全能够满足工程需要。
- Permeable breakwater is economical and reasonable in deep water area with lowr and steep waves. 在水深较大、高较小而波陡较大的水域,透空式防波堤在经济上和结构上都是比较合理的。
- In combination with the Yemen's actual conditions, it is reasonable to adopt overflow concrete face rockfill dam. 结合也门国的实际情况,采用溢流混凝土面板堆石坝比较适用。
- The present method is verified as feasible through the application of an earthwork allocation and transportation problem of a high rockfill dams. 在某大型堆石坝土石方调运中的应用及其与线性规划方法结果比较表明,本文提出的方法是可行的。
- The whole process of breakwater riprapping construction was monitored by the prototype monitoring device buried in the sand soft nappe. 摘要通过埋设在砂肋软体排上的原形观测仪器,对防浪围堤抛石施工过程进行了全程监测。
- Based on stress control triaxial compression test and consolidation test, the indeterminacy of test result for rockfill was studied. 摘要依据堆石料压缩试验和应力式三轴试验成果,对堆石料力学试验中的不确定性进行了论述。
- Transient seepage analyses for Gouhou concrete faced rockfill dam were conducted using the unsaturated soil seepage theory. 摘要利用非饱和土渗流理论,对沟后混凝土面板砂砾石坝进行瞬态渗流数值模拟。
