您要查找的是不是:
- The polypropylene fibre concrete is the new kind of concrete flexible shotcrete layer forms in the soft rock tunnel sup-porting engineering. 摘要聚丙烯纤维混凝土柔性喷层是软岩巷道支护中一种新型的喷层形式。
- Journeys may be diverted via Tai Chung Kiu Road,Che Kung Miu Rd, Hung Mui Kuk Rd &Lion Rock Tunnel Rd non-stop depending on traffic condition. 巴士路线可能因应交通情况而改经大涌桥路、车公庙路、红梅谷路、及狮子山隧道公路,中途不停站。
- Journeys may be diverted via Lion Rock Tunnel Road, Che Kung Miu Road, and Hung Mui Kuk Road non-stop depending on traffic condition. 因应交通情况,此路线可能改经狮子山隧道、车公庙路及红梅谷路,中途不停站。
- The living example show that the technology of deeper fragmenting surrounding rock tunnel repairing by bolting and shotcrete lining is very effective. 通过工程实例证明,锚喷支护技术是一种有效的修复深部破碎围岩巷道的支护技术。
- In order to gurrantee serialization arrangement is very significant to do well the semi-coal rock tunnel orient, and provide several kinds of orient methods. 为保证采连续化布置,搞好半煤岩巷道定向是十分重要的,并提出了几种定向方法。
- Journeys may be diverted via Tai Po Rd, Lion Rock Tunnel Road, Che Kung Miu Rd, Hung Mui Kuk Rd &Lion Rock Tunnel Rd non-stop depending on traffic condition. 巴士路线可能因应交通情况而改经大埔道、蝴蝶谷道、长沙湾道、通州西街及青山公路,中途不停站。
- The Lion Rock Tunnel,linking Kowloon and Sha Tin,began single-tube operation in 1967,with a second tube added in 1978. The 1.4-kilometre tunnel is the most heavily used government tunnel,with 95000 vehicle trips daily. The toll was $6. 狮子山隧道连接九龙与沙田,全长1.;4公里,每程收费六元。该隧道在一九六七年启用时只是单管行车,后来于一九七八年建成第二条管道。该隧道平均每日行车量达95000架次,是使用量最高的政府隧道。
- The Lion Rock Tunnel,linking Kowloon and Sha Tin,began single-tube operation in 1967,with a second tube added in 1978. The 1.4-kilometretunnel is the most heavily used government tunnel,with 97 000 vehicles daily. The toll was $6 in 1997. 狮子山隧道全长1.;4公里,连接九龙与沙田,在一九六七年启用时只是单管行车,其后于一九七八年建成第二条管道。年内每日行车量97000架次,是最多车辆使用的政府隧道,每程收费6元。
- Route 9 (section between Cheung Sha Wan and Sha Tin) will be a new 5.6-kilometre highway running from Sha Tin to West Kowloon. It will significantly alleviate traffic congestion at the Lion Rock Tunnel,Tate's Cairn Tunnel and Tai Po Road. 九号干线长沙湾至沙田段全长5.;6公里,预计建成后可大大纾缓狮子山隧道、大老山隧道及大埔道的交通挤塞情况。
- Route 9 (section between Cheung Sha Wan and Sha Tin) will be a new 5.6-kilometre highway running from Sha Tin to West Kowloon. It will significantly alleviate traffic congestion at the Lion Rock Tunnel, Tate's Cairn Tunnel and Tai Po Road. 九号干线长沙湾至沙田段全长5.;6公里,预计建成后可大大纾缓狮子山隧道、大老山隧道及大埔道的交通挤塞情况。
- The design and construction of gravel tunnel and rock tunnel are different. Rock classifications, such as CSIR-RMR method and Barton-Q system, are not suitable for the gravel tunnel. ?石隧道之??施工?岩石隧道有著明?的不同,如在岩?分?方面?o法使用岩石隧道常用的南非CSIR-RMR及挪威Barton-Q值之定量?估方法。
- The Lion Rock Tunnel, linking Kowloon and Sha Tin, began single-tube operation in 1967, with a second tube added in 1978. The 1.4-kilometre tunnel is the most heavily used government tunnel, with 95000 vehicle trips daily. The toll was $6. 狮子山隧道连接九龙与沙田,全长1.;4公里,每程收费六元。 该隧道在一九六七年启用时只是单管行车,后来于一九七八年建成第二条管道。 该隧道平均每日行车量达95000架次,是使用量最高的政府隧道。
- The Lion Rock Tunnel, linking Kowloon and Sha Tin, began single-tube operation in 1967, with a second tube added in 1978. The 1.4-kilometretunnel is the most heavily used government tunnel, with 97 000 vehicles daily. The toll was $6 in 1997. 狮子山隧道全长1.;4公里,连接九龙与沙田,在一九六七年启用时只是单管行车,其后于一九七八年建成第二条管道。 年内每日行车量97000架次,是最多车辆使用的政府隧道,每程收费6元。
- According to the characteristics of soft rock tunnel in Hongmiao coal mine, the rational support for the tunnel is suggested.The application of bolt and shotcrete support is described in detail. 依据红庙煤矿软岩巷道的特点,提出巷道合理的支护形式,详细阐述了锚喷支护在施工中的应用。
- Smooth blasting is an advanced technique which makes the new wall flat and undamaged and important to the fast excavation in rock tunnel,which affects the quality and driving speed of tunnel. 光面爆破是一种使爆出的新壁面保持平整而不受明显破坏的爆破技术,是岩巷快速掘进工艺的重要环节,它严格影响着巷道的质量和成巷速度。
- They are building a submarine cable tunnel. 他们正在建设一条海底电缆隧道。
- They are digging through the hill to make a tunnel. 他们正在凿山建一条隧道。
- I explore the rock churches, walking inside carved rock tunnels, peering inside doorways to find weathered priests reading leathered bibles. 我继续探索这些岩石教堂,走进这些雕刻而成的地道,在门口窥视到里面一位饱经风霜的牧师正读着一本皮质封面的圣经。
- The rock was honeycombed with passages. 岩石上有许多蜂窝状的小孔。
- The kid dug a tunnel in the sand. 小孩在沙堆里挖了一个地道。