您要查找的是不是:
- Risk management is one of the very important aspects of construction project management, and risk indices are one of the very important contents reflecting the risk of construction project. 风险管理是建设项目管理的一个非常重要的方面,而风险指标是反映建设项目风险状况进行风险分析的一个重要内容。
- According to the statistical data demonstrated, major part risk of constructional projects are from to policy-making stage fault. 据统计资料显示,建设工程项目的绝大部分风险,都源自于决策阶段的失误。
- risk of construction project 施工项目风险
- Preliminary discussion on the risk of construction quality control. 浅谈公路工程中施工质量控制风险。
- Risk Analysis of Engineering Construction Project. 工程建设项目的风险分析。
- For taking the reins of project cost risk in advance and offering references of project risk management, the dissertation brings forward relatively integrate method of construction project cost risk. 为了能在事先较为准确的把握项目成本风险,为项目成本风险管理提供依据,本文提出了较为完整的建设项目成本风险管理基本方法。
- In a greenfield or a brownfield project, the threshold question is, who bears the risk of construction not being completed to agreed specifications and performance criteria, on budget and on schedule? 就绿地投资和褐地投资而言,最基本的问题在于,由谁来承担项目建设没有按照商定的规格和履约标准,以及没有在商定的预算和时间表内完成的风险?
- To have the knowledge of construction investment plan, construction project estimates and construction contracts. 掌握工程投资计划、工程概算资料及各类工程合同。
- Research on the Dynamic Schedule Optimization of Construction Project on the Condition of Minimum Cost/Maximum Benefit. 费用最低/收益最大条件下的工程项目动态进度优化研究
- Be responsible for budget control of construction projects. 负责工程项目的预算控制。
- I don't want to run the risk of meeting John. 我可不想冒遇见约翰的危险。
- A description of construction project scheduling problem with flow processes is given. 首先给出了带流水作业工程项目调度问题的描述;
- The duty of supervising unit in engineering construction is to supervise the work of construction project. 工程建设监理是对工程建设项目建设所实施的监督管理活动。
- He saved my life at the risk of losing his own. 他冒着生命危险救了我。
- The problems existed in the prior period of construction project,such as laggard work and imperfect scheme,are pointed out in this paper. 指出了在建设项目前期工作中存在的问题 ,建设项目前期工作滞后 ,前期方案深度不够。
- Could you cover the Risk of Breakage for us? 你们可以为我们加保破碎险吗?
- To comply with the rules and procedure of construction project settlement in order to ensure the settlement payment accurate and timely. 认真执行工程结算有关规定,严格履行工程结算手续,保证结算付款准确及时。
- He saved my life at the risk of his own. 他冒着自己的生命危险救了我的命。
- That is : owners are client. So , owner is the primary factor on the manage of construction project and the engineering quality. “有什么样的业主,就有什么样的项目管理,也就有什么样的工程质量。”
- The house/highway is in course of construction. 该房子/公路正在施工中。