您要查找的是不是:
- Make the quality plan for key accounts and implement. 针对关键客户指定质量计划并实施。
- Prepare quality plan and inspection sheet for new project or design change. 制定新产品或设计更改的产品的质量控制计划。
- The heat treater has no quality planning effort. 热处理方没有质量控制计划。
- This section applies to quality planning. 这部分适用于质量规划。
- The quality plan includes the product realization processes and the resources to be applied. 质量计划包括产品实现过程和资源的应用。
- To coordinate the work of various production departments so that campaign proceeds according to the quality plan. 根据质量计划协调与各生产部门的关系以便进行生产活动。
- Whether or not the factory has made the relevant quality plan for each application product? 生产厂是否已针对每种申请认证的产品编制相应的质量计划?
- See the Advanced Product Quality Planning and Control Plan reference manual. 见产品质量先期策划和控制计划参考手册。
- The heat treater has no documented evidence of quality planning. 热处理方没有质量控制计划的证据。
- Formulate quality plan based on various product type including sampling plan & test methods. 根据各种产品类型制定质量计划,包括抽样检验方法和其他测试方法;
- To deploy and execute the product quality plan and system for Manufacturing operation effectively with the given resources. 按照质量计划进行质量检验工作。
- Will Supplier submit a quality plan / process qualification package for individual parts assemblies, software, kits, etc. 供应商是否递交了有关每个部件,组件,软件,工具包等产品的质量计划/过程验证材料?
- Repaired and/or reworked product shall be re-inspected in accordance with the quality plan and/or documented procedures. 经修理或重加工之产品应依质量计划或书面程序,重新予以检验。
- Verification of conformance to the specified requirements shall be in accordance with the quality plan and/or documented procedures. 规定要求之查证应依照质量计划或书面程序进行。
- The required inspection and testing, and the records to be established, shall be detailed in the quality plan or documented procedures. 所要求的检验和试验及所建立的记录应在质量计划或形成文件的程序中详细规定。
- Repaired and / or reworked product shall be re-inspected in accordance with the quality plan (Control Plan) and / or documented procedure. 返修和/或返工后的产品应按质量计划(控制计划)和/或形成文件的程序重新检验。
- Train suppliers to use SPC, advance quality planning, capacity planning, etc. 培训供货商使用统计过程控制,先进的质量计划,备货计划等等。
- Review supplier quality plan to ensure all surveillance points are in place, and monitor full execution of company inspection and test plan. 审查供应商的质量规划以确保所有检查点已到位,并监督公司的检查和检验计划得到全面执行。
- These instructions shall be derived from sources such as the quality plan, the control plan and the product realization process. 这些指导书应在工作现场易于得到。这些指导书必须来源于诸如质量计划、控制计划及产品实现过程。
- The framework of ISO 9000 version 2000 documented quality management system is composed of quality manual,standard,quality plan as well as quality record. 20 0 0版ISO90 0 0文件化质量管理体系架构在内容上依然是质量手册、规范、指南、质量计划和质量记录的构成 ;
