- A project scope management plan is contained in,or is a subsidiary of,the project management plan. 项目范围管理计划包含在项目管理计划之内,也可作为其中一项分计划。
- Templates could include work breakdown structure templates,scope management plan templates,and project scope change control forms. 样板可能包括工作分解结构样板、范围管理计划样板与项目范围变更控制表格。
- Project Scope Management includes the processes required to ensure the project inludes all the work reqiured, and only the work reqired, to complete the project successfully. 大致意思就是项目范围管理包括完成项目工作;且只完成项目工作所需要的过程.
- The Contractor's Project Scope Management 承包商的项目范围管理
- Project Scope Management for Virtual Supply Chain 面向虚拟供应链的项目范围管理
- Project scope management for the oil and gas exploration projects 油气勘探项目范围管理初探
- project scope managementph. 项目范围管理
- Scope Verification. Formalizing acceptance of the project scope. 範畴验证----是确保所有明定的专案交付标的已满意地完成。
- As one of the nine knowledge areas of the project management body of knowledge, scope management is of great significance. 范围管理作为项目管理知识体系的九大知识领域之一,占有基础而特殊的地位。
- The project management team in the Scope Definition process further refines the preliminary project scope statement into the project scope statement. 范围定义过程中的项目管理团队将项目初步范围说明书进一步细化为项目范围说明书。
- These changes can require adjustments to the project management plan,project scope statement,or other project deliverables. 这些变更可能要求调整项目管理计划、项目范围说明书,或其他项目可交付成果。
- Project management plan updates provide greater precision with respect to schedule,costs,and resource requirements to meet the defined project scope as a whole. 项目管理计划更新在满足确定的项目范围整体要求方面提高了进度、费用和资源要求的精确程度。
- Resolves, adds, and removes namespaces to a collection and provides scope management for these namespaces. 解析集合的命名空间、向集合添加命名空间和从集合中移除命名空间,以及提供对这些命名空间的范围管理。
- Verify and manage changes to the project scope, project schedule and project costs as defined in the change management plan. 核实和管理对在变更管理计划中定义的项目范围、进度和成本的变更。
- Aker Kvaerner's project scope includes basic engineering, project management, detailed engineering, procurement and construction for the complete facilities, including utilities, warehouse and packaging facilities. Aker Kvaerner的项目范围包括基础工程、项目管理、详细工程、采购和建设完整的设施(包括工具、仓库和包装设施)。
- By managing use cases in conjunction with other requirements your project can be better scope managed, change can be controlled and coverage can be verified. 通过管理用户与其它需求相关联的用例,你可以更好地管理项目,控制变更,并验证覆盖率。
- Six Sigma role similar in function to Black Belt, but length of training and project scope are reduced. 是一个功能上类似于黑带的六西格玛法角色,但培训及计划范围的长度较短。
- The preliminary project scope statement is developed from information provided by the initiator or sponsor. 项目初步范围说明书利用项目发起人或赞助人提供的信息编制。
- Project scope included replacement of 480V and 4.16KV switchgear at 17 existing substations in an NGL plant. 在已经存在的17个NGL工厂分站工程中包含480V和4.;16KV开关设备的置换。