您要查找的是不是:
- Modify project content in the workbench as Programmer 1. 作为开发者1,在平台下修改工程的内容。
- The bridge name now appears in the bridge project content page, as in Figure 6. 桥的名称就会出面在桥项目的内容页中,如图6所示。
- The project contents look like the figure below. 该项目的目录如下图所示。
- The Project Content: The construction of the top ranking recuperate environment. 项目内容:建设一流的疗养环境。
- Project Content: Introducing the investment for the new products developing and market expanding. 引进资金进行新产品开发和市场拓展。
- The Project Content : The 300-mu foundation land is used for studying and developing the gypsum construction products. 项目内容:新征土地300亩,进行新型石膏建材研发。
- The Project Content : The construction of the top ranking recuperate environment. 项目内容:建设一流的疗养环境。
- Project Content: Establish a production line with the use of straw, orange peduncle, calcareousness adjunct with small quantity of special material to produce the plank. 项目内容:在市中区新建一条利用稻草、梗、灰岩附属物加少量专用物质生产板材。
- Project Content : Establish a production line with the use of straw, orange peduncle, calcareousness adjunct with small quantity of special material to produce the plank. 项目内容:在市中区新建一条利用稻草、桔梗、石灰岩附属物加少量专用物质生产板材。
- The Project Content : To mark out 300 mu as the building land for the Leshan Public Relation School and another 300 mu to exploit mass as the commercial apartment building. 项目内容:在市中区新造地中规划300亩修建乐山市公共学校,另外300亩地作为商住楼进行集中开发。
- Project content: Basically produce craft to wait for research and be become by Wang Fengqi of apothecary of hospital of air force Lanzhou. 项目内容:主要生产工艺由空军兰州医院药剂师王凤岐等研究而成。
- The Project Content : The annual production of 100 tonns monocrystal line silicon for the use of solar battery solar cell. 建设条件:建设地峨眉山市,距机场120公里,距火车站8公里,距高速公路25公里;移动、电信、宽带网络覆盖;水电气可满足;项目技术有保障。
- Project Content: Purchase the foreign original production line and adopt the import material to cut, plane, produce and export Solid Wood Veneer material. 购买国外原装生产线,采用进口原材料刨切生产并出口实木单板材料。
- The Project Content : The land construction (treats butchers, slaughters, division, freezes workshop), the processing equipment for slaughters and the sewage treatment. 项目内容:土建(待宰、屠宰、分割、冷冻车间)、屠宰加工机器设备、污水处理。
- Project content: It is to produce the magnet for the high quality products such as hard disk, VCM, VCD, DVD and so on.The magnetism energy product is above 45 unit. 项目内容:本项目主要生产计算机硬盘VCM、VCD、DVD等高档产品的驱动器磁体,而且主要为磁能积为45高斯以上的高档产品。
- Project Content : Along the dykes of Yongding River course to build the tourism and sightseeing zone with the length of 21.2 kilometers and width of 800 meters. 项目内容: 沿永定河故道大堤建设长21.;2公里、宽800米的旅游观光产业带,具体包括五项内容:一是千亩桃花园;
- Project Content Yingzuishan quartz sandstone is distributed in Hongjia churchyard in Sangzhi County, which is 8 kilometers from county seat, traffic is convenient. 项目简介 鹰嘴山石英砂岩矿位于桑植县洪家关境内,距桑植县城约8公里,交通方便。
- The Project Content: Basing on the existing workshop foundation, expand three FD vacuum drying production lines, which was reserved before and totally increase the awning area for600 square meters. 项目内容:在现有厂房的基础上,扩建预留的三条FD真空干燥生产线共计增加棚面积600平方米。
- If everyone does his part, the project will surely be a success. 如果大家都尽责,这个项目肯定会成功。
- He ventured on an ambitious project. 他冒险从事一项富有雄心的计画。