您要查找的是不是:
- primary fault test 一次电故障试验
- For performance and reliability reasons, you decide to take the RCS offline until the primary fault can be determined. 由于性能和可靠性的原因,您决定使 RCS 离线直到确定了主要的故障。
- For performance and reliability reasons,you decide to take the RCS offline until the primary fault can be determined. 由于性能和可靠性的原因,您决定使 RCS 离线直到确定了主要的故障。
- Abstract: A fast and improved method for BIST is introduced, which is aimed to improve the fault test method for combinational circuit. 摘要: 对组合电路的测试提出了一种将确定性测试生成方法与内建自测试相结合的设计方案。
- Secondly,from the angle of vertical tew and level law, inspect the history of principle of liability of foreign internet services,which extract the system of primary fault liability principle and secondary strict liability principle. 其次,从“垂直”单行法与“水平”单行法模式两个角度,考察了国外网络服务商归责原则的发展历史,说明以过错责任原则为主,严格责任原则为辅的双重归责原则体系是网络发展的必然结论。
- There are the trends that the evolution of faults is from a combination of complex and secondary faults to an simple,successive and primary fault. 断裂的空间分布为多重分形结构,断裂的演化有从复杂几何结构的次级断裂组合向单一连续的大断裂过渡而分维值逐渐减小的趋势;
- This paper introduce the information of primary faults in the rotating machinery and application in the field of fault diagnosis of worship diesel generating set. 摘要介绍了旋转机械主要故障的特征信息,并阐述了信息在舰用柴油发电机组故障诊断中的应用。
- A Method for Memory Fault Test in Real-time Systems 应用于实时系统中存储器故障测试的一种新方法
- As accumulators are available in many VLSI circuits, such reuse design can save much hardware cost and be adopted effectively as BIST test pattern generator for robustly delay fault testing. 由于累加器在VLSI电路中普遍存在,本文的复用设计节省硬件成本,可有效用于强健时延故障的测试序列生成。
- Some damaging earthquakes have been followed by no observable large-scale primary faulting but by substantial changes in the local ground elevation. 有些破坏性地震并没有伴随可见的大规模原生断裂,但局部地面却有很大的标高变化。
- According to the fault of charge indicating lamp always being on or flashing, it systematically analyses its induction output circuit and exciting circuit and affords the fault testing procedures. 针对标致汽车行驶中充电指示灯常亮或微微闪动的故障,从感应输出电路、激磁电路进行系统分析,并提出检查故障的步骤。
- Delay Fault Test in Boundary Scan and Scan Path Architectures 扫描与边界扫描电路延迟故障的测试
- The disease is still in its primary stage. 这疾病仍然在初发阶段。
- The little boy left primary school at eleven. 这个小男孩十一岁时小学毕业。
- . After implementation the DB155M2IP,we test the performance of the DB155M2IP ,the hot time between primary system and secondry system ,fault upload,fault test,fault location. 在进行DB155M2IP系统故障检测和切换时,可通过软件直接自动实现系统之间的切换,这样大大缩短了切换时间。
- Sure. We are friends since primary school. 当然,我们从小学就是朋友了。
- I started primary school when I was 5 years old. 我五岁时开始读小学。
- Multiple Fault Test Based on Neural Networks and its Parallel Implement 基于神经网络的电路多故障测试及并行实现
- A primary cause of Tom's failure is his laziness. 懒惰是汤姆失败的主要原因之一。
- Primary school teachers use a lot of visual aids. 小学教师使用大量的视觉教具。
