您要查找的是不是:
- practical task assignment 实习作业
- The student completed the task assign by his teacher. 学生完成了老师布置的作业。
- Task assignment is one of the most important works in WFMS. 任务分派是工作流系统的重要工作内容。
- In your Inbox, open the e-mail message that contains the task assignment. 在“收件箱”中,打开包含任务分配的电子邮件。
- The task assigned, dangerous or otherwise, must be finished as scheduled. 所指派的工作,危险或不危险,必须如期完成。
- To finish the other task assigned by the leader. 完成上级委派的其他任务。
- Complete work task assigned by higher leader. 完成上级交付的其他工作任务。
- Other task assigned by supervisor. 主管交代的其他工作。
- I have a positive ability to lose myself in practical tasks. 我有一个长处,干起活来颇能专心致志。
- Ad hoc task assigned by finance manager. 其他财务经理安排的工作。
- Task assigned by figured line manager. 完成压花线经理给予的其它任务。
- When you receive a task assignment, you must decide whether to accept or decline the task. 收到任务分配时,您必须决定是要接受还是拒绝该任务。
- But servo systems have serious non-linearity when glutinosity of the oil and system load changed and some uncertain ingredients affected of the servo system in practical task. 但由于实际工作中电液伺服系统中液压油的粘性的变化、系统负载变化以及一些不确定因素的影响,使得电液伺服系统具有很严重的非线性。
- You can specify the skills that are needed for a task assignment, rather than the actual person needed on the assignment. 您可以指定任务分配所需的技能,而不是分配所需的实际人员。
- Based on the current duplex-operation implement and the practical task requirements,a Design of general multiple-operation system based on the network and software was presented. 根据当前的双工实现方式和实际的任务需求,提出了一种基于网络和软件的通用多工系统解决方案。
- Collaborative design task assignment model was set up based on temporal intervals compartmentalization and task precedence. 基于划分时间区间法和优先度准则,给出了协同设计任务分派模型。
- The proposed task assignment algorithm not only minimizes the computing time but also the communication time resulted form the subtask migration. 我们的工作指派演算法除了考虑降低工作的运算时间, 同时也考虑降低子工作转移所需的通讯时间。
- Using the defined reasonable task assignment path and its concatenate operation, the solution of And/Or tree of WAR was studied. 利用定义的合理指派路径及其串联操作,分析了工作流授权合理性问题与/或树节点的可解性。
- This model introduced a 0-1 scheme matrix and a workload matrix to describe task assignment and time load scheduling respectively. 该模型引入0-1方案矩阵和时间负荷矩阵,分别描述了独立任务分配问题和负荷调度问题;
- Other tasks assigned by the superior. 其他由上司分配的任务。