- To estimate the maximum ground acceleration of safe shutdown earthquake(SSE)for nuclear power plant site is a most important work of the structuralengineer,seismologist and geologist. 估计核电站的安全停堆地震地面最大加速度是核电站土建设计工程师、地震、地质专家的一项最重要的任务.
- Design Basis Flood Level is one of the important parameters in nuclear power plant siting in coastal area,and evaluation for storm surge is the main factor of Design Basis Flood Level. 设计基准洪水位是滨海核电厂选址中的重要参数之一,而风暴潮评价又是设计基准洪水位的主要组成因素。
- The soldiers blew up the enemy power plant. 士兵们炸毁了敌人的发电厂。
- This is in truth an ideal site for a power plant. 这里的确是建设发电厂的理想场所。
- The farm has its own power plant. 这家农场自己有发电设备。
- They are planning a new nuclear power plant. 他们正在策划一座新的核电厂。
- The excitement about the new power plant was merely town talk. 关于新发电厂的纷纷议论只不过是桩传闻。
- SOME EVALUATIONS FOR STORM SURGE IN DETERMINATION OF DESIGN BASIS FLOOD LEVEL ON COASTAL NUCLEAR POWER PLANT SITE 在滨海核电厂设计基准洪水位确定中的风暴潮评价
- Methodological Problem of Wind Power Plant Site Selection in Mountainous Areas in Yunnan Province 云南山区风电场选址的方法问题
- Gaojing Power Plant will switches to gas-fired. 区域燃气热电联产工程。
- Due to a slip-up at the power plant, there was a five hour blackout. 发电厂的疏忽导致停电五小时。
- An outflow of water from a power plant. 从发电站流出来的水
- Cooperate with Tech. Support to solve the problem on the plant site. 同技术支持同事合作解决工厂现场问题。
- Jan.6th 2006, The site preparing of Putian Gas Power Plant was completed. 1月6日,中海福建燃气发电有限公司莆田电厂“场平”工程完工。
- Japanese Nuclear Power Plant Leak Large. 日本核电厂泄漏高于最初报导。
- About the safety of this nuclear power plant. 核电站的安全问题了。
- One of the examples is Beilun Power Plant. 北仑发电厂就是其中的代表。
- That is the Wind Power Plant on Guolao Mountain. 那就是位于果老山上的风能发电厂。
- A new power plant is soon to go on stream. 一座新的电厂即将投入运行。