您要查找的是不是:
- Since the axial tension force varies along pile length, maximum at the pilehead and minimum at the piletoe. 抗拔桩的桩身轴力沿桩长方向是变化的,桩顶处桩身轴力最大,桩端处桩身轴力最小,桩中部的桩身轴力介于两者之间。
- In this paper serveral problems are studied, which conclude varying parameters for composite foundation, determination of pile length in deep soft soil, selection of cushion. 结合工程实践,对复合地基变形控制中的几个问题,如变化参数的复合地基、加固深厚层软土时桩长的确定、褥垫层等,进行了探讨。
- The critical pile length is calculated herein,and the solution is compared with the FEA solution that verifies the validality of the method developed in this article. 在此基础上,推导了柔性桩临界桩长的计算公式,并与有限元方法的计算结果做了比较。
- Numerical analysis of single pile composite foundation system is performed to reveal the influence of factors as load vs.settlement curve,axial forces,side friction,natural soil,cement admixture ratio and pile length etc. 采用该模型对水泥土单桩复合地基体系进行了数值模拟分析,研究了水泥土复合地基的荷载-沉降曲线、水泥土桩的轴向力、侧摩阻力和桩土应力比,以及母土、水泥掺合比、桩径和桩长等因素的影响。
- Moreover, with analyzing the features of the calculation parameters such as materials of gunite mortar, jet pressure, diameter of the jet pipe, pile length, pile layout, a design theory for chemical churning pile composite foundation is proposed. 通过对喷射浆液、喷射压力选取、喷射直径估算、桩长及桩位设计等各种计算参数的深入分析和研究,提出了一套相应的旋喷桩复合地基设计计算方法;
- Optimum Design of Cement Mixing Pile Length 水泥搅拌桩桩长的优化设计
- computing formula of pile length 桩长公式
- I have a huge pile of letters to deal with. 我有一大堆信件要处理。
- This mathematical model presents the valuing range for single pile bearing capacity or pile side friction in case of designing different pile lengths. 该数学模型为不同桩长的设计,提供了单桩承载力或侧摩阻力的取值范围。
- The result testifies that compaction under reamed bored piles obtain good results under the same geological conditions, such as increasing pile bearing capacity up to 75.3% and reducing settlement and pile length. 结果表明,在同等工程地质条件下挤扩支盘桩提高承载力可达75.;3%25,并能减少沉降和缩短桩长,具有良好的经济效益。
- She's been piling up money ever since she got the job. 自从得了那份工作以来,她一直在攒钱。
- The data testifies bored piles with branches and plates obtaining good results under the same geological conditions,such as increasing pile bearing capacity and reducing settlement and pile length. 试验结果表明,同等工程地质条件下挤扩支盘灌注桩能提高承载力、减少沉降和缩短桩长,具有良好的经济效益。
- The little boy is piling up his building blocks. 小男孩正在搭积木。
- My walking stick is the same length as yours. 我的拐杖和你拐杖长度一样。
- This car will turn in its own length. 这种汽车可以在自身长度范围内掉头。
- I arrived at that city at length. 我最终到达了那个城市。
- Your letter got buried under a pile of papers. 你的信压在一堆文件下面了。
- This river is ten times the length of that River. 这条河的长度是那条河的十倍。
- She paced out the length of the room. 她用步子测量了房间的长度。
- I bet they are making a pile out of the deal. 我肯定他们这笔生意一定赚大钱。
