您要查找的是不是:
- Demand-side management (DSM) is an effectual means in peak load leveling. 摘要需求侧管理(DSM)是电网移峰填谷的有效手段之一。
- The peak load current limit is set by the user's selection of a reference voltage and current-sensing resistors. 用户可通过选择参考电压和电流感测电阻设置峰值载荷电流限制。
- On that peak load day, start the Perfmon log on each server at 4:00 A.M and let it run for 24 hours. 在出现高峰负载的那天,于上午4:00在每个服务器上启动Perfmon日志,并让它连续运行24小时。
- Specific performance objects, counters, and instances were collected during peak load and other observation times. 在峰值负载和其他观察期收集了特定的性能对象、计数器和实例。
- Monitor the ex2003base servers for a 24 hour period on the day that usually experiences peak load (Monday for many companies). 在通常会遇到高峰负载的那天(很多公司是星期一)连续24小时监视ex2003base服务器。
- These pockets were characterized sometimes by low usage, but occasionally by a lack of sufficient resources to handle the peak load. 这些资源的特性是有时使用率很低,但偶尔会因为资源不足而被用来处理一些峰值负载。
- After analyzing the collected data, it was found that the peak load was 2,129 concurrent users averaging 18.8 Requests per second. 分析完收集的数据后发现;峰值负载为2;129个并发用户每秒平均发出18.;8个请求。
- Using GM(1,1) model to predict short-period load has good accuracy, but to the high waving peak load, its accuracy is low. 用GM(1,1)模型预测短期负荷虽具有很好的精确性,但对于波动性较大的高峰负荷,它的预测精度比较低,而马尔可夫模型可以克服负荷波动较大的局限性。
- The load relaxation tests after peak load indicate that rockburst has two types the one is original rockburst, and the other is impellent rockburst. 对岩石峰值载荷后的松弛试验发现具有两类岩爆:一类是本源型岩爆;
- Weekly operational checks should be carried out at 320MW in presence of shift charge Engineer. Test should be completed before system peak load period. 每星期在值长在场的情况下,机组负荷达到320MW时,进行操作检查。测试应在系统带尖峰负荷前完成。
- The experiments show that there exists an apparent turning point before the peak load in resistance-CMOD curve of CFRC beam. 试验研究发现,峰值荷载前CFRC梁的电阻-CMOD曲线均出现明显的转折点。
- The simulation results show that the model is practicable and feasible, and it is beneficial to reduce the gild peak load and improve the load curves. 算例仿真分析表明该模型是切实可行的,它有利于减小电网高峰负荷,改善负荷曲线。
- Gas and steam combined cycle power plant possesses the advantages of high efficiency, low pollution excellent peak load regulation performance ete. 摘要燃气蒸汽联合循环发电,具有高效率、低污染、调峰性能好等一系列优点。
- Presents respectively the theoretical calculating methods of peak load regulating in direct and indirect geothermal district heating systems. 摘要介绍了直接式和间接式地热供热系统调峰负荷的理论计算方法。
- Discusses the interregional control of power distribution during peak loading. 摘要探讨了在用电峰值时段对多地区之间进行限电分配的问题。
- Either we end up over-planning and have underutilized servers, or we under-plan and find our applications crashing at peak load - when we least want them to crash. 或者以超出计划却未充分利用服务系统而告终,或者是计划不够周全以至应用系统在尖峰负荷下崩溃而这不是我们希望的。
- Grid computing joins these independent resources into a single pool and shares the peak load from each independent group of users across the entire set of resources. 网格计算将这些独立的资源连接到一个资源池中,并可以在整个资源集之间共享每个单独的用户组的负载。
- The pumped-storage generating unit pumps water at low load of power grid to decrease the loss of thermal generators, and modulate the load at the peak load of power grid. 摘要抽水蓄能机组在电网低谷负荷时作抽水负荷,降低火电机组的压火损耗;电网高峰负荷时顶替火电机组出力调峰。
- The fault condition of the heating networks would be changed by the gas-fired boiler set in secondary networks of district heating(DH) system as peak load regulating boiler. 以某工业园区为例,分析了工业园区集中供热系统的特点,提出热电联供蒸汽热网的设计结构及配汽站管道系统的设计结构。
- Home appliances, meters, transformers and generators could all share data and work together to make the power grid more efficient, for example by lowering the peak load. 家用电器、电表、变压器和发电机都可以分享数据并协同工作,从而通过降低峰值负载等方式使电网变得更高效。