您要查找的是不是:
- The algorithm used serial schedule generation scheme (SSGS) to generate a feasible schedule and employed ACO to search the optimal schedule. 该方法采用串行进度产生方案(SSGS)产生可行进度,并利用ACO进行最优进度的搜索。
- The optimization schedule models and simulation of CPL are created, and the simulation system is developed, which is run by a CPL in Chongqing as the project background. 建立了优化调度模型和优化调度仿真模型,研制了仿真系统,并以重庆某卷烟厂生产线为工程背景进行了仿真。
- Be responsible for the implementation of ASB overseas network RNO contract, plan network optimization schedule for the whole radio network and perform network optimization task. 负责ASB海外网络优化合同的实施;对整个网络制定网络优化方案;执行网络优化任务.
- I was frantic to finish the report on schedule. 我十万火急地要按预定时间完成报告。
- This paper deals with the optimal schedule algorithms of multiprocessor. LEVEL, LABEL, MC schedule algorithms for dependent tasks as well as LPT, PIT, MF schedule algorithms for independent tasks are discussed respectively. 本文论述多处理机系统的最佳调度算法;其中包括针对相关任务而提出的LEVEL、LABEL、MC调度算法以及针对独立任务而提出的LPT、PIT、MF调度算法.
- Based on the model for FRFS problem,this paper improves the current solution to by combining branch-and-bound algorithm with partan algorithm and by selecting the most optimal schedule. 在FRFS问题模型的基础上,将分枝定界法与平行切线法相结合,选取最优资源投入量,进而得到最优计划,完善了柔性资源计划问题的解法。
- I haven't got a clue about the train schedule. 我一点都不知道这个列车时刻表。
- Aiming at the irrationalities of static task scheduling in collaborative product development and design, a dynamic optimized scheduling method based on the least finish time is proposed. 摘要针对协同产品开发中设计任务静态排序的不合理性,提出了一种基于最小化完工时间的任务优化动态排序方法。
- The delays put the whole schedule out of joint. 一再的拖延打乱了全部安排。
- The optimizing schedule of the VBR stream disk I/O and buffer computing in special situation[J].Journal of Central South University of Technology:Natural Science,2001,32(2):204-208. VBR流磁盘I/O的优化调度及特定的缓冲计算[J].;中南工业大学学报:自然科学版;2001;32(2):204-208
- Characterizations of optimal schedules are established for both versions. 对两类问题讨论了最优排序的某些特征。
- OPTIMIZED SCHEDULE FOR PRODUCTION WITH TWO CONVERTERS AND THREE CASTERS 唐钢二炉三机生产组织的优化
- The project was completed ahead of the schedule. 这项工程提前完工。
- The new schedule come into operation on June 1st. 新的日程表是从6月1日开始实行的。
- The plane's departure was on schedule. 飞机准时起飞。
- They have planned a tight schedule of travel. 他们安排了一个紧凑的旅行日程。
- The principal has a very tight schedule. 校长的日程表排得满满的。
- partial global optimized scheduling 部分全局优化调度
- The project is behind schedule again. 这项计划又没按时完成。
- The teacher posted the schedule of classes. 教师将课程表公布出来了。