您要查找的是不是:
- Research of algorithm of general examination system on opening test library and generating paper and judging paper 通用考试系统开放题库与组卷及评卷算法研究
- The Design of the General Examination System on Opening Test Library and the Research of the Algorithm of Encrypt & Decrypt 通用考试系统的开放题库设计与加解密算法研究
- opening test library 开放题库
- Tighten bypass hose at test cock No.1, open test cock No.1. 紧固测试旋塞1号上的旁路软管,开启测试旋塞1号。
- Tighten bypass hose at test cock No. 1, open test cock No. 1. 紧固测试旋塞1号上的旁路软管,开启测试旋塞1号。
- Open test cock No. 1 and bleed valve "A" on top of test kit. 开启测试旋塞1号和检测组件顶部上的排气阀“A”。
- Close needle valve "A" high side (red) and open test cock No. 2. 关闭针形阀“A”高端(红),并开启测试旋塞2号。
- Open test cocks to drain in cold climates if only operated seasonally. 如果仅仅是季节性运行,则在寒冷环境下开启测试旋塞。
- The output of this procedure is promising with above 98% accuracy in open test. 开放测试结果表明分词精确率可达 98%25以上
- Open test cock No. 2 and needle valve "A" high side (red) on test kit. 开启测试旋塞2号和检测组件上的针形阀“A”高端(红)。
- Open test cock2. Installing EZ-TC adaptor opens test cock2. 开启测试旋塞2号。安装EZ-TC适配器,开启测试旋塞2号。
- Open test cock3. Installing EZ-TC adaptor fitting opens test cock3. 开启测试旋塞3号。安装EZ-TC适配器连接件,开启测试旋塞3号。
- Open test cock 2. Installing EZ-TC adaptor opens test cock 2. 开启测试旋塞2号。安装EZ-TC适配器,开启测试旋塞2号。
- Open test cock No. 4 and flush test cocks Nos. 1, 2 and 3 on reduced pressure assembly then close test cock No. 4. 开启测试旋塞4号,冲洗减压总成上的测试旋塞1号,2号和3号,然后关闭测试旋塞4号。
- B. Open test cock No. 4 and flush test cocks Nos. 1, 2 and 3 on reduced pressure assembly then close test cock No. 4. 开启测试旋塞4号并冲洗减压总成上的测试旋塞1号,2号和3号,然后关闭测试旋塞4号。
- Open test cock 3. Installing EZ-TC adaptor fitting opens test cock 3. 开启测试旋塞3号。安装EZ-TC适配器连接件,开启测试旋塞3号。
- Open test cock 4. EZ-TC on test cock 4 would already be open. The water should maintain its position in the sight tube. 开启测试旋塞4号。在测试旋塞4号上的EZ-TC应该处于开启状态。观察管内的水位应该保持。
- After shutoff valves are closed, open test cock #2, #3 to relieve pressure within the backflow assembly. 在关闭了关闭阀后,开启测试旋塞2号,3号和4号,释放回流阀总成的压力。
- Open test cock 3. EZ-TC on test cock 3 would already be open. The water should maintain its position in the sight tube. 开启测试旋塞3号。测试旋塞3号上的EZ-TC应该已经开启。水应该保留在观察管内的位置上。
- Close shutoff valves and open test cocks No. 2, 3 and 4 to relieve pressure from the body of the valve. 关闭关闭阀,并开启测试旋塞2号、3号和4号,释放阀体内压力。