您要查找的是不是:
- NURBS surface reconstruction of measuring data points. 研究了测量点数据的NURBS曲面重构。
- Print all measured data out at same Time. 检测数据纪录打印一次完成。
- Aiming at the characteristics of MAF, the chapter research the method of processing route based on digitizing measuring data. 针对磁力研磨加工的特点,研究基于数字化测量数据的加工路径生成方法。
- Applying trigonometry,only a few measurement datum are needed to confirm the status of the emitter,so it is a fast means of passive location. 运用解三角的方法,只需要少量的测量数据即可解得目标的运动状态,可在较短时间内实现被动定位。
- According to measuring data,this can block 75% of the accumulating sand in the grottoes every year. This should be an encouraging success. 根据测量,每年能挡住窟区积沙的75%25,这应该是一个鼓舞人心的成功。
- The method makes use of such information as optical measuring data, instrumentation aircraft position and drone aircraft position, etc. 本文针对这种情况,提出一种利用机载实况记录系统输出的测角数据、机和靶机位置数据等信息,对机载平台动态测姿精度进行检验的方法。
- Is the test and inspection measurement data recorded in the report? 检查报告是否有记录检查数据?
- The measured datums from local site are explored carefully. 然后对现场所采集的实测沉降数据进行分析;
- It can be saved daylong calibration and measure data. 它可以保存一整天的校准和测量数据。
- SP1.3: Specify how measurement data will be obtained and stored. 制定度量数据的收集及存储办法。
- SP1.4: Specify how measurement data will be analyed and reported. 制定度量数据的收集及存储办法。
- For field test of developed TSMS, HADONG #5 was selected and DAS was installed for measuring data of temperature and pressure sensors. TSMS现场试验选择和安装了HADONG~(%235)和测量系统以测量传感器的温度和压力数据。
- In this paper, the law of change on raising speed of leadline and main factors affecting leadline going up have been expounded by analysis to measured datum and theory. 摘要通过对实测数据和理论分析,阐述了在收绞括纲过程中围网下纲提升速度的变化规律和影响下纲提升的主要因素。
- According to measuring data, this can block 75% of the accumulating sand in the grottoes every year. This should be an encouraging success. 根据测量,每年能挡住窟区积沙的75%25,这应该是一个鼓舞人心的成功。
- The method to synchronize two stations' measurements datum was given.Then with the synchronous datum, the way to get the location of the maneuvering target was given. 给出了一种同步两站数据时间的方法,然后用同步后的数据对机动目标进行定位。
- Also the design method of measuring programme is introduced for MPU AVR AT90S8535. At the end, the measuring data is analysed. 还介绍了以AVR单片机AT90S8535为主机的测量程序设计方法;最后对测量结果进行了分析.
- These two methods are simple and facile,and measuring data is very reliable.Favorable effects have been obtained in practice. 两种方法不仅简单易行,而且测量的数据准确,在实践中取得良好效果。
- For missile flight test, telemetering data and exterior ballistic measuring data arethe basis of precision and reliability analysis. 在导弹飞行试验中,遥外测数据是进行精度和可靠性分析的依据。
- Converting a nonlinear problem to a linear one by m eans of theleast square fit method,it is presented a nonlinear error modeling m ethod based on the measuring data. 利用最小二乘技术识别模型参数,将非线性问题作线性化处理,提出了一种基于测量数据反演非线性误差模型的建模方法。
- Analyze optical measurement data in order to improve product's performance. 分析光学测量数据,提高产品性能。