您要查找的是不是:
- Keywords: I-M3 System; Production Planning; Process Ticket; Workshop Management; Mould manufacturing cycle time. 关键词:I-M3系统;生产计划;加工工票;车间管理;模具制造周期
- manufacturing cycle time 生产周期
- Main memory cycle time has bottomed out. 主存贮器的周期已趋饱和。
- Check and set up standard process cycle time. 评估制造成本,制定标准工时,减少资源浪费。
- What is the average cycle time of this process? 流程的平均周期时间为何?
- What steps can be taken to reduce the cycle time? 什么步骤可以减少周期时间?
- Throughput time / Cycle time reduction. 制造周期和产品周期的缩减。
- Not only for FAB manufacturing quality, but also for cost saving, the meaning of GOI inline monitor cycle time successful optimization is far-reaching. 它的成功对于晶圆代工厂来说,无论是从产品品质的安全性角度考虑,还是对生产成本的控制,都具有非常积极的意义。
- Wein, L. M. "On the Relationship Between Yield and Cycle Time in Semiconductor Wafer Fabrication." IEEE Transaction on Semiconductor Manufacturing 5, no. 2 (May 1992). 着,“半导体晶圆制造良率与制程时间的关连性”半导体制造IEEE会刊第5卷第2号(1992年五月)
- To oversee and manage the manufacturing operations and ensure machine cycle time, takt time and people balance based on customer requirement and minimize variable production cost. 监督并管理生产运营,确保机器周转时间,按客户要求调整时间及人员分配,将可变生产成本最小化。
- Wood, S. C. "Cost and Cycle Time Performance of Fabs Based on Integrated Single-Wafer Professing." IEEE Transactions on Semiconductor Manufacturing 10, no. 1 (February 1997). 着,“依据整合单一晶圆制程的晶圆厂成本与制程时间的绩效”半导体制造IEEE会刊第10卷第1号(1997年二月)
- Can variable cycle times be modelled? 是否能够模拟可变时间周期?
- Mould、manufacturing cycle、the nback-propagation(BP) nerual network、the mathmatical model. 模具生产周期预测,制造周期,设计周期,人工神经网络BP算法
- The fast mould clamping unit can short the cycle time of production. 快速锁模装置,缩短生产周期。
- The device that assists repartition concept ability to will been used so only and flotsam still arrive nearly in manufacturing cycle. 只有偌助再分配概念才能将使用过的设备和废料近还到生产循环中去。
- As a general rule, the shorter the cycle time, the higher the quality. 一般来说,循环周期愈短,品质愈高。
- The conclusions that the method can save cost,keep satisfactory in quality,meet performance requirement,and shorten manufacturing cycle. 得出了该方法节省费用,保证质量,满足性能要求,缩短制造周期的结论。
- One working cycle time exceeds the reset time under full automatic working. 在全自动操作时,一个作业循环时间超过设定时间时。
- As generic components have been standardized and serialized and may need to be flexible configuration, can shorten design and manufacturing cycle. 由于通用部件已经标准化和系列化,可根据需要灵活配置,能缩短设计和制造周期。
- Barrier screw and pre-plasticizing design helps to reduce cycle time. 双螺纹螺杆及塑化并行的设计有助于缩短注塑周期。
