您要查找的是不是:
- The single machine scheduling problem with continuous resources was discussed. 摘要讨论具有连续资源的单机排序问题。
- Multi-rule single machine scheduling problems with discretely controllable processing times are considered. 摘要讨论了工件具有离散可控加工时间的单机多准则下的排序问题。
- The computational results show that the genetic algorithm is efficient and fit for large scale identical parallel machine scheduling problem. 计算结果表明,并行遗传算法是有效的,且能适用于大规模并行多机调度问题。
- Identical parallel machine scheduling problems with family setup times are studied.A three-phase heuristic algorithm is developed to minimize the total earliness and tardiness. 摘要 研究了优化目标为总拖后/提前时间最小化的并行机成组调度问题,提出了一种三阶段启发式近似求解算法。
- In this paper, we address the single machine scheduling problem with discretely controllable processing times, Our objective is to minimize the makespan plus the total processing cost. 摘要考虑工件加工时间离散可控的单机分批排序问题,目标函数是极小化最大完工时间与加工费用之和。
- Sivrikaya-Serifoğlu, F. and Ulusoy, G.,“Parallel machine scheduling with earliness and tardiness penalties,”Computers and Operations Research, Vol. 26, No. 8, pp 773-787, 1999. 张启明,平行机器在优先权及双重设置时间下之动态排程,国立台湾科技大学硕士论文,民国87年。
- Abstract: In the fuzzy environment that the processing times and the due-dates of jobs are fuzzy parameters, the total completion earliness problem of single machine scheduling is investigated. 摘 要: 在工件的加工时间及工期均为模糊参数的情况下;研究了单机调度中的总提前完工量问题.;当工件具有共同工期及相同提前隶属水平时;给出了使得总提前完工量达到最大的最优调度;
- In the fuzzy environment that the processing times and the due-dates of jobs are fuzzy parameters, the total completion earliness problem of single machine scheduling is investigated. 摘要在工件的加工时间及工期均为模糊参数的情况下,研究了单机调度中的总提前完工量问题。
- The port tugboat operation scheduling is a kind of parallel machines scheduling problem with special process constraint. 港口的拖轮调度过程是一类带特殊工艺约束的并行多机调度问题。
- The machine must break down at this busy hour. 正忙的时候,机器偏偏又坏了。
- The uses of this machine are manifold. 这台机器有多种用途。
- dyeing machine scheduling problem 染缸优化调度
- dynamic single machine scheduling 动态单机调度
- non-identical parallel machine scheduling 非等同并行多机调度
- identical parallel machine scheduling 流水作业
- single machine scheduling problem 单机调度问题
- The new grinding machine passed all tests. 这台新磨床通过了所有的试验。
- Oil feeds into the machine through this tubing. 油经过这个管子流入机器。
- Did you get a good trade-in on your sewing machine? 你以旧缝纫机折价换新合算吗?
- This paper discusses disruption recovery for single machine scheduling with assignable due dates to total tardiness. For all these models, we give the optimal schedules or nearly optimal schedules. 摘要本文考虑了单机排序中带可分配工期的总误工问题的应急管理问题。针对不同情况建立不同的模型,利用交换和动态规划的方法,得到了每个模型的最优解或近似解。