您要查找的是不是:
- This doctoral dissertation discusses the rockery part's seepage system control of large concrete dams which has always been a problem for the construction department. 本博士论文研究实际设计部门提出的大型混凝土坝岸岩绕坝渗流系统的控制问题。
- Seismic safety evaluation of large concrete dams 混凝土大坝的抗震安全评价
- THERMAL STRESS IN THE POURING AND SETTING OF LARGE CONCRETE DAMS 大型混凝土坝浇筑中的热应力问题
- Developing Tendency of the Seismic Safety Evaluation of Large Concrete Dams 混凝土大坝抗震安全评价的发展趋向
- large concrete dams 混凝土大坝
- Research Development of Safety Analysis for High Concrete Dam. 高混凝土坝安全分析方法的研究进展。
- There is a crane ahead that is hanging a large concrete pipe. 前面有一台吊车正在吊着一只大水泥管。
- Application of large concrete mat foundation is less interiorly. 大体积混凝土筏板基础在国内应用较少。
- With concrete dam ageing, the change takes place in it's deformation modulus. 随着坝龄的增长,混凝土大坝的变形模量将发生变化。
- Optimize the Process of Prestressed Loading on Large Concrete Flume Structure. 大型混凝土渡槽的预应力施加程序优化。
- Literally thousands of concrete dams are providing water supply shortage, irrigation, flood control, and power generation. 可以毫不夸张地说,有成千上万座混凝土水坝正在供灌溉,给水、防洪、发电之用。
- This type of clinonear was designed for measuring unidirectional deflection of concrete dams or the variation of inclination of rocks and fault dips. QX-10遥测倾斜仪是为监测混凝土大坝坝体单方向倾角变形而研制的。
- The thermo stresses in the concrete dam will produce because of changing of weather temperatures. 由于气温的交替变化,处于寒区的混凝土大坝必然产生温度应力。
- The problem of thermal stress and a need for temperature control in the mass concrete construction also occur in the roller compacted concrete dams(RCCD). 大体积混凝土的温度应力问题与温度控制要求在碾压混凝土坝中同样存在。
- This paper instance gallery in concrete dams, discusses design idea of CAD software on blocks of steel bar of gallery and method of connect technology of the blocks is solved. 以混凝土坝内廊道结构为例,论述了廊道cad软件设计中钢筋的模块化设计思想和解决模块间拼接技术难题的方法。
- Therefore it provides a new effective way for discerning elastic parameters of concrete dam body and rocky foundation. 从而为识别混凝土坝体和岩石基础弹性常数提供了一条新的有效途径。
- Or ask why is the United States, Japan and other advanced countries using large concrete Shimizu, Beijing Why did people use? 或者问,为什么现在美国、日本等先进国家大量采用清水混凝土时,北京为什么就没人采用呢?
- The physical equation and elastic matrix for the rolled concrete dam is deduced based on the anisotropic elasticity. 由各向异性体的物理方程推导了碾压混凝土的物理方程和弹性矩阵。
- This paper analyzes the cause of large concrete crack in the construction engineering, and puts forward preventive measures. 摘要文章分析了建筑工程中大体积混凝土裂缝产生的原因,提出了预防措施。
- Large concrete footings must bear this burden as well as transverse loads from 100-mile-per-hour winds against the tank (the standard storm rating). 大型混凝土水塔的底座必须支撑这麽大的重量,同时抵挡时速160公里(标准风暴等级)的横向风力。
