您要查找的是不是:
- key construction period 控制性工期
- The construction period is Only 2.5 Years. 全部工程工期需要2.;5年。
- To remove the unfavorable impact caused by the temperature rise of hydration heat during the construction period is key to the design of high RCC arch dam. 控制拱坝的裂缝是拱坝设计中必须认真解决的问题,而消除施工期水化热温升的不利影响,是碾压混凝土高拱坝设计中的关键。
- Efforts should be made to do a good job in key construction projects. 搞好重点项目建设。
- It is easily installed, with short construction period and low cost. 安装方便、灵活,施工周期短,综合造价低。
- Foreign capital is mainly used in the key construction and in technology reformation of the existing enterprise. 外资主要用于关键的建设项目和现有企业的技术改造。
- The compacted clay dam and percolate and methane collection system are two key factors that control the investment and construction period of the solid waste landfills of Hongshantou in Xiangfan city. 摘要襄樊市洪山头垃圾填埋场投资和建设周期均受控于压实粘土坝和渗滤液与沼气收集系统两个关键因素,技术难度大。
- As early as the early state in the national 156 key construction projects, Baoding have 8. 早在建国初期,在全国156个重点建设项目中,保定就有8个。
- The term may exceed 30 years for projects involving large investment,long construction period and low returns. 投资大、建设期长、资金利润低的项目,合营期限也可以在30年以上。
- The construction of upstream slope of cushion materials of faced rockfill dam is one of key construction items. 摘要面板堆石坝垫层料上游坡面施工是一项关键项目。
- The construction is divided into three bids with consideration to the construction period and construction scale. 本工程因考量工期及施工规模共区分为三标。
- Manager is always in a dilemma as to facility tendering in state key construction project. 对我国重点建设项目设备招标中存在的两难现象进行了简单分析。
- The construction project decision is one of the most important decisions during the whole construction period. 工程项目建设方案决策是整个项目建设期间最重要的决策之一。
- The whole project is plotted in two stages for development. Total construction period is four years. 预计项目建设所需时间:整个工程分两期开发,总工期年。
- Taking into account the special circumstance of Tibet, the government will provide most of the funds for the key construction projects in Tibet. 考虑到西藏的特殊情况,西藏的重点建设项目资金主要由国家来承担。
- What way processing does wind power field construction period construction trash use? 风电场建设期间的建筑垃圾采用什么方式处理?
- Manwan Hydropower Station, located in the middle stream of Lancang River, is the largest state key construction project in Yunnan Province. 摘要位于澜沧江中游河段的漫湾水电站是云南省至今投资最大的国家重点建设项目,电站建设和运行以来出现了一些社会、经济和生态环境问题。
- The term may exceed 30 years for projects involving large investment, long construction period and low returns. 投资大、建设期长、资金利润低的项目,合营期限也可以在30年以上。
- Trust between partners has become a key construct in interfirm relationship management. 合作伙伴之间的信任问题已经成为公司之间关系管理的关键部分。
- During the construction period and with in to the government of Zhejiang province and Shaoxing city. 建设期项目区范围内,行政性规费除上缴省、绍兴市外,所有部门规费全免。