您要查找的是不是:
- intermediate pressure cylinder start-up 中压缸启动
- intermediate pressure cylinder starting 中压缸启动
- Essentials analysis of starting modes of cold intermediate pressure cylinder in steam turbine 汽轮机冷态中压缸启动方式要点分析
- Research on Optimization of Intermediate Pressure Cylinder Start Process for 600MW Unit 600MW机组中压缸启动过程的优化研究
- Analyzing and Processing for Serious Steam Leaking of Joint Face of No.1 Steam Turbine's High Pressure and Intermediate Pressure Cylinder 1号汽轮机高中压缸结合面严重漏汽分析与处理
- Start-up of the First Imported Domestic-made Supercritical Parameter 600 MW Steam Turbine Through Intermediate Pressure Cylinder 首台国产引进型超临界600 MW汽轮机的中压缸启动
- CAUSE ANALYSIS OF EXCEEDING LIMIT FOR POSITIVE DIFFERENTIAL EXPANSION OF INTERMEDIATE PRESSURE CYLINDER ON STEAM TURBINES AND IMPROVEMENT MEASURES THEREOF 汽轮机中压缸正胀差超限的原因分析及改进措施
- intermediate pressure cylinder 中压汽缸,中压缸
- Reasons and Countermeasures of Large Temperature Difference Between High and Intermediate Pressure Cylinders 汽轮机高、中压缸温差大的原因分析及对策
- Improvement of Low Pressure Cylinder made by Siemens Co. 西门子公司汽轮机低压缸的改造方法。
- Bending failure of intermediate pressure rotor of No. 3 unit in Shajiao C Power Plant occurred during trial operation. 沙角C厂3号机在试运过程中,发生中压转子弯曲事故。
- The heating medium is feedwater supplied from the outlet of the HRSG Intermediate pressure economizer. 加热介质为余热锅炉中压省煤器中流出的给水。
- The first stage reduces inlet pressure to a preset intermediate pressure, typically 350 to 500 psig. 第一级把入口的压力降到预定的中间压力,该压力典型值为350到500psig。
- Moreover, by injecting the liquid at an intermediate pressure point, the other benefits are provided. 并且,通过在中间压缩点注入所述液体,还可以获得其他好处。
- Diameter Indexing Safety System (DISS) -- Intermediate pressure port where a hose attaches, leading to demand valve or other apparatus. 直径指数安全系统(DISS)--中介压力端口,接著一条软管,连接需求阀或其它设备。
- The calculations of the strength,stiffness and steamtight are very importang when high pressure and intermediate pressure casing of 300 MW steam turbine are designed. 本文采用三维弹性接触理论,建立300MW汽轮机高中压外缸的有限元模型,进而计算了汽缸的温度场、应力和变形。
- Cause analysis of negative differential expansion of 330 MW steam turbine's high pressure cylinder in Mengda Power Generation Co.Ltd. 蒙达公司330 MW机组高压缸负胀差大的原因分析。
- The paper introduces the analysis of 500MW steam turbine low pressure cylinder clapboard s cracks and introduces the way to settle it. 对某发电厂500MW汽轮机低压缸40级隔板中分面出现的裂纹进行了分析,并介绍了处理情况,确定了正确合理的补焊方案及工艺,供铸铁件补焊修复缺陷时参考。
- start-up through intermediate pressure (IP) cylinder 中压缸启动
- It discusses the location and characteristics and causes for turbine low pressure cylinder,and suggests some measures of preventing &slowdown this corrasion. 对汽轮机低压缸腐蚀进行了论述,分析了低压缸腐蚀部位、特征及腐蚀机理,并提出了防止和减缓低压缸腐蚀的措施。
