您要查找的是不是:
- initial water cut in reservoir 储层初期含水率
- Jamin effect, the open and close of microfracture, starting pressure gradient in reservoir result in high initial water cut. 地层微裂缝的开启与闭合、启动压力梯度的存在导致生产井初始含水率较高;
- Factors affecting the initial water cut in ultra - low permeability oil reservoirs of north Fan31 block 樊31北块特低渗透油藏初始含水率的影响因素
- Technologies of EOR in late stage of high water cut in Wenzhong oilfield. 文中油田高含水后期提高采收率技术
- Keywords ultra-low permeability reservoir;microfracture;initial water cut;starting pressure gradient;water lock effect;Jamin effect; 特低渗油藏;微裂缝;初始含水率;启动压力梯度;水锁效应;贾敏效应;
- Reservoir management in high water cut stage. O Chen Yueming. 高含水期油藏经营管理
- The oil viscosity increases with the water cut in the process of waterflooding development. 水驱油田开发过程中,原油黏度随含水率升高而增加。
- Keywords structure;water lock effect;Jamin effect;ultra low permeability oil reservoir;initial water cut;starting pressure gradient; 构造;水锁效应;贾敏效应;特低渗透油藏;初始含水率;启动压力梯度;
- Bacteria A metabolizes non-water soluble polymer, decreases the water cut in the produced fluid in oil wells, and increases the single well production. 摘要A菌在储层中代谢非水溶性聚合物,能够降低油井产出液含水,提高单井产量。
- Our tanks cut in ahead of the escaping aggressors. 我们的坦克抢到前面去拦住那些溃逃的侵略者。
- A laboratory analysis shows that emulsification is related to the chemical type and concentration and water cut in acting force and system. 室内研究认为,乳化与作用力、体系中的化学剂类型和浓度及含水率等因素有关。
- Bacteria A metabolizes non-water soluble polymer, decreases the water cut in the produced fluid in oil wells,and increases the single well production. 菌在储层中代谢非水溶性聚合物,能够降低油井产出液含水,提高单井产量。
- The number shall be cut in on a plate. 号码将雕刻在一块金属板上。
- A gem cut in the form of a narrow rectangle. 狭长形宝石被切成细条形的宝石
- The lorry overtook me and then cut in (on me). 那辆卡车超越我的车後,突然插入我前方的位置。
- Don't try to cut in while others are talking. 别人谈话时不要插嘴。
- The workers had to take a cut in pay. 工人们只得同意削减工资。
- Various acidizing augmented injection techniques of water well are important for adjusting water injection structure in order to“stablizing oil production and controlling water cut”in Daqing Oilfield. 大庆油田为确保“稳油控水”进行的注水结构调整,各种水井酸化增注工艺技术显得十分重要。
- Where can we make a cut in this long article? 这篇长文在什麽地方可以删掉一些?
- At his command, CTGPC has reached the two TGP construction milestones of initial water impoundment of reservoir and ship lock operation in 2003. 在他的领导和指挥下,2003年三峡工程顺利实现了初期蓄水和船闸通航两大目标。
