您要查找的是不是:
- induction wind tunnel 诱导风洞
- The planes survived the wind tunnel test intact. 这些纸飞机在测试风道中丝毫未损。
- It is not correct to think of the wind tunnel having uniform flow. 设想风洞具有均匀的气流是不正确的。
- Setting very low speeds in a wind tunnel is always a vexatious problem. 在风洞中调出低风速来始终是一个麻烦问题。
- It should be noted that a balance is not always required in a wind tunnel. 应该指出,天平对风洞来说并非是绝对必须的。
- The aerodynamics characteristics of this airfoil is studied in wind tunnel. 进行了翼型的低速气动力性能研究,为附面层特性研究提供了方向。 结果表明,该翼型具有较好的升阻和俯仰特性,但失速特性差。
- The wind tunnel is produced under a technical cooperation agreement with Ford Co of US. 风洞机是根据与美国福特公司的技术合作协议生产的。
- Any flight test and wind tunnel correlation always suffers from a great number of unknowns. 在对飞行试验与风洞试验进行比较时总有大量的未知数。
- The experiments were conducted in a wind tunnel at a location 50 ft downwind from the fan. 实验是在风洞中距离风机50英尺处进行。
- The damping derivatives can only be determined experimentally in the wind tunnel or ballistic range. 阻尼导数只能用风洞或弹道试验来确定。
- In the experiment under the 20 m/s wind tunnel conditions, the wind abrasion modulus is almost zero. 在每秒20米的风洞实验中,吹蚀模数几乎为零。
- In this paper, the initial stage in application of fuzzy logic to aircraft high-angle-of attack aerodynamics using wind tunnel test data is outlined. 本文概述最初阶段利用风洞试验数据应用模糊逻辑研究飞机大攻角空气动力学的情况。
- In the experiment under the 20 m/s wind tunnel conditions,the wind abrasion modulus is almost zero. 在每秒20米的风洞实验中,吹蚀模数几乎为零。
- NASA and Boeing said data from the flight are already being compared with data from wind tunnel tests. NASA和波音公司的数据说,从飞行正在与风洞试验数据。
- fixed speed induction wind turbine 恒速异步风力发电机
- The design method has successfully solved the problem of design and matching of Swivel Table for Sand-Dirt Wind Tunnel. 所提出的设计方法成功地解决风洞转台的设计与匹配问题,有效地缩短了设计周期。
- double-fed induction wind genertor 双馈异步风力发电机
- The experimental results of low temperature ablator (beeswax and camphor) tests in the hypersonic wind Tunnel are presented in this paper. 本文给出了低温烧蚀材料的高超声速风洞烧蚀实验研究的结果。
- doubly-fed induction wind generator 双馈感应风力发电机
- As part of this effort, an integrated scramjet model is about to begin testing at up to Mach 5.6 in a new wind tunnel in Beijing. 作为该项工作的一部分,一个可达5.;6马赫的综合冲压模型即将在北京的一个新的风洞内开始测试。