您要查找的是不是:
- hydroturbine load rejection 水轮机甩负荷
- Water-hammer control analysis for load rejection of impulse turbine. 冲击式水轮机甩负荷负荷水击反分析与控制方法研究。
- It is shown that the two factors are the main error resources of load rejection testing using dynamometry method. 分析表明,以上因素均是导致测功法试验结果偏高的原因。
- Load rejection testing of turbogenerators using dynamometry method gives a calculated value of speed rise higher than the measured value in the equivalent routine testing. 目前测功法甩负荷试验算出的飞升转速偏高于等价条件下常规法甩负荷的测量结果。
- At low head, it's easy entering 'S' zone causing speed unstable, difficult synchronizing and reversed power afterwards, or un-stable at no-load speed after load rejection. 经现场调试知,当机组在低水头发电空载运行时,极易进入"S"形特性区域,造成机组并网困难、逆功率或甩负荷后不能达到空载稳态。
- A heat providing turbine generator of 200MW takes place a malfunction load rejection in last winter, and speed upswing rapidly, then leads to mechanic emergency protection device act, as a result turbine tripped. 某电厂 2 0 0 MW供热机组在冬季供热期发生了故障甩负荷 ,机组转速飞升导致汽机危急保安器动作 ,引起机组跳闸。
- This paper apply ASME "Feed Water Pump NPSH Analysis During Load Rejection" theory to check BFP NPSH of Zhuhai Power Plant 700MW Units in the condition of VWO and also confirm the calculating result by load rejection test. 利用ASME的“甩负荷时给水泵汽蚀余量的分析”理论 ,校核了珠海电厂容量 70 0MW机组在最恶劣工况即阀全开跳机工况时的给水泵汽蚀余量 ,并在甩负荷时 ,进行了试验验证。
- Abstract: This paper apply ASME "Feed Water Pump NPSH Analysis During Load Rejection" theory to check BFP NPSH of Zhuhai Power Plant 700MW Units in the condition of VWO and also confirm the calculating result by load rejection test. 文摘:利用ASME的“甩负荷时给水泵汽蚀余量的分析”理论,校核了珠海电厂容量700MW机组在最恶劣工况即阀全开跳机工况时的给水泵汽蚀余量,并在甩负荷时,进行了试验验证。
- In this paper, an optimized closing law of the guide vane is adopted to solve the pressure surge which occurs in the load rejection process of the hydraulic turbine unit for Masjed-e-Soleyman project. 本文主要介绍了通过优化导叶关闭规律解决苏力曼电站在机组甩负荷过程中出现压力激波问题的过程,分析了有关原因,为相关电站提供了参考。
- This paper introduces the load rejecting test process of Hengshui Power Plant steam turbogenerator unit and explicates the control of the test correlative systems. 介绍了衡水恒兴发电有限责任公司二期工程汽轮发电机组甩负荷试验过程,并对试验相关系统的控制进行了闸述。
- Bind down the ropes around the load on the lorry. 把绕在卡车上货物外面的绳子扎紧。
- She will not shove the heavy load onto others. 她不愿意把重担推给别人。
- I absolutely reject the management's line on this. 我断然否绝经理部门处理此事的方法。
- I make it clear to him that I reject his proposal. 我清楚地告诉他,我拒绝了他的建议。
- I am obliged not to reject their proposal. 我没法反对他们的方案。
- Load rejection tests for Unit 1 in Zhuhai Power Plant 珠海发电厂1号机组甩负荷试验
- The maximum load for this lorry is one ton. 这辆卡车最大载重量是一吨。
- LOAD REJECTION TEST FOR UNIT NO.4 OF SHENYANG THERMAL POWER PLANT 沈阳热电厂4号机组甩负荷试验
- A Study on Low-voltage Load Rejection in Shanghai Power Grid 上海电网负荷低电压释放问题的研究
- I've never heard such a load of garbage! 这麽胡说八道我还从来没听说过。