您要查找的是不是:
- The cracking process of Austrian Kolnbrein double curvature thin arch dam heel,analysis of cracking cause by domestic and foreign specialists and approach to cracking mechanism of arch dam by authors are presented. 介绍了奥地利Kolnbrein双曲薄拱坝坝踵产生裂缝的过程和国内外专家对裂缝成因的分析,以及作者对拱坝产生开裂的机理的探讨。
- RCC double-curvature thin arch dam 碾压混凝土双曲薄拱坝
- high and thin arch dam 高薄拱坝
- super high and thin arch dam 特高薄拱坝
- Application of Adjustable Turning-over Form Technology in Thin Arch Dam Construction 可调试翻转模板技术在薄壁拱坝施工中的应用
- On roller compacted concrete mix design and its performance double curvature thin arch dam 双曲薄拱坝碾压混凝土配合比设计及性能研究
- Fault tree analysis is used to analyse the high arch dam risk. 摘要利用故障树分析法对高拱坝进行风险分析。
- Scherbel said in a high thin voice. 谢尔伯尔尖着嗓子高声地说道。
- thin arch dam 薄拱坝
- Problems and Countermeasures of Earthquake Evaluation for High arch Dam. 高拱坝重大地震灾变评估的障碍和对策。
- Cracking Analysis of High Arch Dam Heel Based on Deformation Reinforcement. 基于变形加固理论的高拱坝坝踵开裂评价。
- Spline Semi - analytical Method for Stress Analysis of Thin Arch Dams 薄拱坝静力分析的样条半解析法
- The dynamic performance test of dam concrete is a key problem to the construction of high arch dam at present. 大坝混凝土动态性能试验为当前高拱坝建设亟待解决的一个关键问题。
- Arch dam is one of foremost dam types in hydropower projects. 拱坝是水利水电工程中最重要的坝型之一。
- Based on the emulate analysis,overloading modulus and wreck evolution process of high arch dam was completed. 通过仿真分析得到了小湾拱坝在各种荷载条件下的超载系数及拱坝的破坏演变过程。
- The aseismatic stability of abutment jointed rock mass is the key problem of high arch dam. 高拱坝体型设计是关系到大坝安全和经济的关键技术问题。
- The stability of arch dam against elastic buckling has always been ignored. 摘要拱坝的抗屈曲稳定性一直是未被重视的问题。
- Overturning and sliding are seldom a factor in the design of arch dam. 拱坝设计中很少考虑倾覆和滑动的问题。
- To remove the unfavorable impact caused by the temperature rise of hydration heat during the construction period is key to the design of high RCC arch dam. 控制拱坝的裂缝是拱坝设计中必须认真解决的问题,而消除施工期水化热温升的不利影响,是碾压混凝土高拱坝设计中的关键。
- A separate structure is provided to block the space between the arch dam and the reservoir bank. 需要另有一种单独的结构物来填补拱坝的库岸之间的空间。