- Through analysis, the main reasons of high fill embankment faults are unreasonable design and construction of subgrade. 通过分析指出路基设计不合理以及施工工艺不当是造成高填方路堤常见病害的主要原因。
- Combined with the practice,the paper analyzed the cause of highway high fill embankment and cut settlement,and proposed countermeasures. 结合高速公路的实际,分析了公路高填方路堤及路堑下沉的原因,提出了防止沉陷的措施。
- The shape and location of the slip curve surface,the ultimate bearing capacity under load were found out when the high fill embankment on slope foundation was under unstable condition. 结合山区高速公路建设的实践,采用足尺模型试验,得出荷载作用下斜坡地基上高填方路堤滑动破坏面出现的位置及形态,并测定了其相应的极限承载力。
- Application of Horizontal Slice Method in Stability Analysis of High Fill Embankments at Slope 水平条分法在贴坡高填方路堤稳定性分析中的应用
- high fill embankments 高填方路堤
- Common Diseases of High Fill Embankment and Tacking of Them 高填方路堤常见病害及治理
- Testing Study on Stress of New Type Support Structure of High Fill Embankment 高路堤新型支挡结构力学特性的试验研究
- Application of Thin Wall Pipe Pile in Treatment of Soft Soil Foundation of High Fill Embankment 薄壁管桩在高填土路堤软基处理中的应用
- Treatment and Practice for Seepage Water of Expressway Foundation with High Fill Embankment 高速公路高填路堤地基渗水的处理与实践
- high filling embankments 高填方路堤
- A Study on Property of Soil Pressure and Reduced Burden of Culvert Below High Fill Embankment 高填土路堤下涵洞受力特性与减荷研究
- Research on Modulus of Compressibility of Foundation for High Filled Embankment 高填路堤地基压缩模量研究
- high fill embankment 高填土路堤
- This text take some introduce on construct safe side such as drainage of subgrade, construct on high fill deep moat subgrade, landslide transact etc. 简要介绍了路基排水、填深堑路基施工、坡处治、土处治等施工安全方面的问题。
- As soon as the weighing cell measures the preprogrammed fill quantity in the container, the valve stem is closed, ensuring high fill volume accuracy. 当称量单元确定瓶子重量已达预先设定的满瓶重量时,灌装阀立刻关闭,因此可以确保精确的满瓶重量。
- Base on the actual engineering of geotextile reinforced cushion on high fill ground treatment, the design key-points and construction methods are presented in the paper. 结合土工织物加筋垫层处理高填土地基的工程实例,介绍土工织物加筋垫层处理设计要点和施工方法,并根据施工效果检验结果证明该方法的可靠性。
- Mining with backfilling is restrained by relatively high filling cost. 充填采矿由于充填成本较高而制约着其发展。
- The paper discussed the process control of fill embankment used in high-grade highway,and proposed some problem for reference. 随着公路交通网覆盖率的日益扩大,在广大的山区和丘陵地带填石路堤将成为一种常见的结构形式。
- Through the analysis of the cracking in the side wing of high fill mason U-type bridge abutment, discussion is made on the cases that include the structure limitation, distorted bearing course, and improper construction, and provided the countermeasures. 通过对几座高填方U型桥台在侧墙相接处由上向下开裂现象分析,认为是由于U型桥台构造本身的缺陷、持力层的变形、施工不合理等原因造成了U型桥台开裂,提出了合理的处理方法,并针对以后设计、施工此类结构提出了对开裂U型桥台加固处理的建议。